Laserfiche WebLink
Proposed Decision and Findings of Compliance, Permit Revision Number 3; dated July 22, 1992. <br />Regarding changes to reclamation plan. 13 pages <br />Correspondence dated June 12, 1995; addressed to Dave Bucknam, signed by James Pendleton. <br />Regarding Dutch Creek Flume. 4 pages. <br />Coal Basin / Rock Tunnel Project; Field Directives No. 1 (July 26, 1996) and No. 2 (August 16, <br />1996. Regarding Rock Tunnel Drainage System. 2 Pages. <br />Coal Basin / Waste Pile Project; Field Directives No. 4 (October 10, 1995) and Change Order <br />No. 4 (November 27, 1995); Regarding changes to Sutey Ditch 8 construction. 2 pages. <br />Coal Basin / Waste Pile Project; Suspend and Resume Work Order No. 4a (October 10, 1995) <br />and Suspend and Resume Work Order No. 4b (October 28, 1995 ). Regarding changes to Sutey <br />Ditch 8 construction. 2 pages. <br />Coal Basin / Mine 4 Project; Change Order Number 1, dated September 14, 1995. Regarding <br />revegetation practices. 1 Page. <br />Coal Basin / Mine 4 Project; Change Order Number 2, dated September 20, 1995. Regarding <br />excavation of various areas. 1 Page. <br />Coal Basin / Mines 1 and 2 Project; Field Directive Number 2, dated September 11, 1996. <br />Regarding Road D reclamation. 1 page. <br />Coal Basin / Rock Dump Project; Change Order Number 1, dated August 30, 1996. Regarding <br />excavation of borrow area, removal of excess soil materials. 1 page. <br />Coal Basin / Warehouse Project; Change Order Number 1, dated October 3, 1997. Regarding <br />enhancement of reclamation through excavation and revegetation modifications. 1 page. <br />Coal Basin / Roads E, F, G Project; Change Order Number 1, dated. Regarding backfill of fan <br />access road. 1 page. <br />Coal Basin / Waste Piles Project; Change Orders Number 1, 2, 3, 4, dated August 30, 1995, <br />September 19, 1995, October 3, 1995, November 27, 1995, respectively. Regarding changes to <br />drainage system. 4 pages. <br />Coal Basin / Mine 3 Project; Change Orders Number 1, 2, 3, 4, dated September 6, 1995, <br />September 11, 1995, September 21, 1995, November 3, 1995, respectively. Regarding <br />revegetation practices, and filling of mine opening. 4 pages. <br />Coal Basin / Mine 4 Revegetation Project; Field Directives 1, 2, 3 dated September 2, 1997, <br />September 2, 1997, and September 12, 1997 respectively. Regarding acreage adjustments and <br />material application changes. 3 pages. <br />