Laserfiche WebLink
Chapter V <br /> + C. DETAILED TIMETABLE FOR THE <br /> COMPLETION OF EACH MAJOR STEP <br /> IN THE RECLAMATION PLAN <br /> 1 . Disturbed Areas. <br /> DISTURBED AREAS <br /> COAL BASIN <br /> Locations Disturbed Area* <br /> Central complex 51.2 <br /> Tunnel/adit to central <br /> complex 39.6 <br /> Old refuse pile 13.6 <br /> Sutey refuse site 46.2 <br /> Pads Roads <br /> No. 1 5.6 32.5 <br /> No. 2 7.7 3.9 <br /> No. 3 7.4 27.5 <br /> No. 4 2.9 22.0 <br /> No. 5 11.5 25.3 <br /> Mine pad downslopes 22.0 <br /> Exploration drill road 7.4 <br /> Subtotals <br /> 213.2 119.7 <br /> TOTAL 332.9 Acres <br /> * Acres. <br /> Mid-Continent has received small area exemptions, pursuant to 4.05.2(3)(b)(i), for the <br /> following disturbed areas: <br /> Powder magazines in the vicinity of the Adit/Rock <br /> Tunnel and Nos. 1 and 4 portal areas. <br /> 4 <br />