My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (230)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (230)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 10:10:30 AM
Creation date
6/19/2012 2:58:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP) 1999 Correspondence
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Generally, the reclamation provisions of the Act require that excavated areas, such as highwalls, <br /> be backfilled with earthen materials so that the original, pre-mining topography (commonly <br /> referred to as approximate original contour, or AOC) is reestablished, that drainages and streams <br /> are returned to their original condition,that pollution of waters (including sedimentation, a <br /> common coal mining related problem) from the mining operation does not occur, that topsoil be <br /> returned to the disturbed areas, and that disturbed areas be revegetated to a pre-defined standard. <br /> The Act requires that a reclamation bond be submitted by the coal mining company. The bond is <br /> to be sufficient in amount so that the State can accomplish reclamation of the site according to <br /> the requirements of the permit and of the Act should the operator default prior to completing the <br /> required reclamation tasks. The amount of the bond is determined by periodically estimating the <br /> cost of reclamation given these requirements and site conditions. <br /> As required by the Act, Mid-Continent submitted a mining and reclamation permit application. <br /> This multi-volume application was evaluated by the Colorado Division of Mined Land <br /> Reclamation(Division), predecessor to the Division of Minerals and Geology. During the <br /> evaluation process, many pieces of correspondence were generated by both Mid-Continent and <br /> Division staff. This correspondence contains many modifications to the originally submitted <br /> plan, and also contains many reclamation commitments. The record thus created includes many <br /> different pieces of information which are pertinent to reclamation of the site. Upon approval of <br /> the permit, as required by the Act,the Division complied the pertinent operational and <br /> reclamation information contained in the permit application and that which was submitted as a <br /> part of the permit review process. Based upon the agreed upon operations and reclamation plans, <br /> an estimate of the cost of reclaiming the mine site was agreed upon by the Division and <br /> Mid-Continent. A summarization of the agreed upon operating and reclamation plan, as well as <br /> summaries of environmental baseline information was recorded in a document prepared by the <br /> Division entitled"Proposed Decision and Findings of Compliance" (Findings). <br /> As allowed by the Act, Mid-Continent submitted many revisions to its operations and <br /> reclamation plans over the years following permit issuance. In 1988, Mid-Continent submitted a <br /> renewal application. This application largely duplicated the original permit, however, many new <br /> pieces of information were added as a result of operating for about five years under the original <br /> permit. As with the original permit review, an extensive record of operational and reclamation <br /> related commitments was created, another estimate of the cost of accomplishing reclamation was <br /> generated, and a new Findings document was prepared . Subsequent to issuance of the renewed <br /> permit, a number of revisions were again proposed by Mid-Continent, and subsequently <br /> approved by the Division. <br /> The records created during the original and permit renewal review processes, and the revisions to <br /> each of the two permits all contain information pertinent to the reclamation of the Coal Basin <br /> Mine. The Division believes that all of this information constitutes the Permit, and thus forms <br /> the reclamation plan. <br /> As it is pertinent to the current litigation, the critical elements of the reclamation plan include: <br /> - Revegetation of the mine bench outslopes; <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.