Laserfiche WebLink
areas:roughening of surfaces such as the pond embankments and the short access roads in order to promote infiltration <br /> and dispersal of flows;construction of small retention berms; diversion of u <br /> embankments, access reads and pond margins. These messures will be implemented during construction and will be <br /> maintained as access allows,until the Division completes its reclamation activities t flows;and revegetation of <br /> as- <br /> these efforts will provide a rcasonsble level of sediment control from the construction areasCoal . As stated above,believe <br /> ethat <br /> maintenance would continue for a limited time,and then DMG would request permit termination. <br /> mine <br /> If you have questions or hone nu comments, <br /> below_ or require further information,please leave a message for me at the <br /> P mbc; <br /> We would appreciate WQCD•s immediate attention to this matter, and <br /> request <br /> by Friday,May 7, 1999. Please FAX your response to us at(303)832-06,Attentiion. Glenda Williams.Q �ty Control <br /> Sincerely, <br /> en G.Renner <br /> Project Manager <br /> (970)241-0336 <br /> CC: Michael Long <br /> David Bucknam <br /> 11Linden . <br />