Laserfiche WebLink
REGULATORY PROGRAMS OVERVIEW <br /> PAGE 4 <br /> 3-01-40B (Continued) <br /> 3. Ineligible costs include those related to the preparation of new maps, plans or drawings and <br /> those related to site surveys conducted for the purpose of horizontal or vertical control, <br /> acquisition of photogrammetric data or preparation of a new reclamation plan or design. <br /> The costs of the reclamation work itself are also ineligible. <br /> FEDERAL ASSISTANCE MANUAL <br />