ANNUALREPORT <br /> COAL BASIN MINE RECLAMATION <br /> 2001 CONSTRUCTION <br /> Summary <br /> Reclamation work at Coal Basin in 2001 was directed at completing earth work and <br /> revegetation in the vicinity of the old flume, and at maintaining previously reclaimed <br /> areas. <br /> Maintenance was accomplished by inventorying the majority of the reclaimed areas at <br /> the site, and developing a priority list of objectives to be accomplished. Most of the <br /> maintenance accomplished focused on additional drainage control along the roads <br /> reclaimed in 2000, and along the Sutey Refuse Disposal Area perimeter ditch. Weed <br /> control and construction of a fence around the previously reclaimed Bear Creek Project <br /> Area were accomplished as part of the overall maintenance effort. <br /> Reclamation of the slope at the previous location of the flume outfall was accomplished. <br /> The overly steep slope in this area was reconstructed, topsoil was applied, and the area <br /> was roughened, seeded and mulched. <br /> Field work for anticipated 2002 Projects was accomplished. One of the two Projects to <br /> be completed in 2002 was bid and awarded in the fall of 2001. <br /> Monitoring of the Mine Bench Outslopes continued in 2001. Site specific <br /> measurements were obtained, and future maintenance needs were identified. <br /> Compliance with the two Storm Water permits was maintained throughout the year. <br /> One of these permits may be terminated in 2002. <br /> The Bond Forfeiture Account had an approximate balance of$301,870 at the end of <br /> 2001. 2002 expenditures, excluding maintenance costs, are projected to vary between <br /> $70,000 and $140,000. <br /> Public outreach diminished in 2001, as reclamation neared completion. Public <br /> presentations were made in Redstone, and new Forest Service personnel were toured <br /> through the site. <br />