My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (209)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (209)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 9:32:35 AM
Creation date
6/19/2012 1:05:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sutey Pile Collection Ditch System <br /> Exhibit 1 shows the final map of the reclaimed Sutey Refuse Area . <br /> Collection ditches are numbered 1 through 8 . All ditches except <br /> Ditch #8 are dug out of the re-topsoiled area and do not have any <br /> special lining . Ditch #1 is trapezoidal in nature . Ditches 2 <br /> through 7 are V-ditches . <br /> Ditch #8 has a very steep slope and has had problems in the past <br /> using a rip-rap lining . For this reason , the ditch has been re- <br /> designed using the C- 125 lining material that is also used in the <br /> Sutey Diversion . <br /> The entire hydrologic system has been sub-divided into 16 <br /> subwatersheds and each are routed to the sediment pond inlet using <br /> the Storm program developed by the Office of Surface Mining . <br /> Overlay 1 , which when placed directly over Exhibit 1 , shows all of <br /> the watersheds , the null structures , the CN numbers and the <br /> acreages for each watershed . The printout shows all the routing <br /> parameters and the peak flows for each null structure . <br /> The ditch designs follow the peak flow printout . The Storm program <br /> was also used to design all ditches except for Ditch #8 which is to <br /> be a vegetated channel and is calculated separately . <br /> A11 ditches have been designed for the 100 year - 24 hour event of <br /> 2 . 8 inches . Since the area is to be revegetated with grasses , a CN <br /> of 79 will be assumed for the long term condition of all reclaimed <br /> watersheds . A CN of 76 is used for all undisturbed watersheds . <br /> (.7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.