Laserfiche WebLink
Permit Revision 2 <br /> review of three submittals offers considerable potential for confusion, this revision is <br /> intended as a stand-alone document, and I request you review it as such. <br /> Included for addition to or replacement of pages in the current permit document are the <br /> following: <br /> Vol. 3, II-13-7 Att. 2 Update to MK Plan ii <br /> Vol. 3, II-B-7 Att. 2 Measures for Sediment 48-58 <br /> Control on Roads <br /> Note: TR-19 <br /> proposes insertion <br /> of the original <br /> Fleming Drainage <br /> plan in 11-B-7 Att. <br /> 2, as pages 35- <br /> 47 <br /> Vol. 3, 11-B-7 Att. 2 Schedule for Implementation 59-67 <br /> Hydrologic Control - of Sediment Control <br /> Roads Measures <br /> Vol. 1, Chap. II Road Maintenance Revised Pages <br /> Operations Plan 18-20 <br /> Vol. 8, Chap. V Interim Reclamation - Haul Revised Pages <br /> Reclamation Roads 17-22(b) <br /> Note: This <br /> overlaps with TR- <br /> 23, <br /> Vol. 3 Maps - Haulage Road Revisions to <br /> lI-B-App.7-Att.2 (1)- Drainage - Details of designs <br /> (7) Drainage Structures, Plans <br /> for Roads A&B, C, D, E, F, <br /> and G <br /> Discussion, Adequacy Review. <br /> A. C-91-016 <br /> NoV C-91-016 required placement of riprap beneath specified culvert outfalls and ditch <br /> relief drains. This work was completed last fall. <br /> 2 <br />