My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (223)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (223)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 9:56:17 AM
Creation date
6/19/2012 1:04:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9. Drill 8 3/4" hole below 9 5/8" casing with <br /> air-mist to 2600/2750' testing for gas each <br /> 30/60 ft. 1 1/2 Days <br /> 10. Condition hole, trip out and run 7" slotted <br /> liner from total depth back to 2250'+, do <br /> not cement. 1 Day <br /> 11. Blow water out liner with nitrogen with drill <br /> pipe at 2750'+ or TD of liner. Try to dry <br /> out hole as much as practical. 1 Day <br /> 12. Lay down drill pipe and clean mud tanks. 1/2 Day <br /> 13. Rig down Drilling Rig. 1 Day <br /> Estimated Total Time: 17 1/2 Days <br /> Operators Total Time: 15 Days <br /> Contractors Total Time: 2 1/2 Days <br /> * Contractors Expense <br /> -5- <br />,I <br />