Laserfiche WebLink
13. Rig up and run 500' of 7", 23#, ST&C slotted <br /> liner from total depth lapping liner back into <br /> 9 5/8" casing approximately 150' . Use 4 <br /> centralizers and Baker Liner tools. Set liner <br /> on bottom. DO NOT CEMENT. <br /> 14. Using drill pipe and nitrgen, blow water from <br /> hole and clean up well bore. <br /> 15. Continue to test and clean out well with air <br /> until test results are acceptable. <br /> 16. Practice safety at the well site at all times. <br /> -3- <br /> E <br />