Laserfiche WebLink
BULLDOZER WORK <br />Task description: Regrade Rail Spur <br />Site: Hayden Gulch Loadout Permit Action: SLl <br />PROJECT IDENTIFICATION <br />Task #: 002 State: Colorado <br />Date: 6/15/2012 County: Routt <br />User: JLE <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D l OT - 10SU <br />Horsepower: <br />574 <br />Blade Type: <br />Semi- Universal <br />Attachment: <br />3 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Page 1 of 2 <br />Permit/Job #: C1992081 <br />Abbreviation: None <br />Filename: C081 -002 <br />Total unit Cost/Hour: $332.09 <br />Total Fleet Cost/Hour: $664.18 <br />MATERIAL QUANTITIES <br />Source <br />Utilization % <br />Ownership Cost/Hour: <br />$111.83 <br />NA <br />Operating Cost/Hour: <br />$181.78 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.49 <br />NA <br />Total unit Cost/Hour: $332.09 <br />Total Fleet Cost/Hour: $664.18 <br />MATERIAL QUANTITIES <br />Source <br />Initial Volume: <br />80,000 <br />Swell factor: <br />1.125 <br />Loose volume: <br />90,000 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />100 feet <br />1,718.9 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />-10% <br />6,400 feet <br />2,650 lbs /LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor <br />Source <br />Operator Skill: 0.750 <br />AVG.) <br />Material consistency: 0.900 <br />(CAT HB)) <br />Dozing method: 1.000 <br />(GEN.) <br />CIRCES Cost Estimating Software <br />