My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-06-18_REVISION - C1992081
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1992081
>
2012-06-18_REVISION - C1992081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:00:43 PM
Creation date
6/19/2012 12:46:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Revision
Doc Date
6/18/2012
Doc Name
Adequacy Review Letter & Cost Estimate
From
DRMS
To
Roy Karo
Type & Sequence
SL1
Email Name
JLE
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCRAPER TEAM WORK <br />Task description: Remove TAHR Surface Material to Pit <br />Site: Hayden Gulch Loadout Permit Action: SL1 <br />PROJECT IDENTIFICATION <br />Task #: 502 State: Colorado <br />Date: 6/18/2012 County: Routt <br />User: JLE <br />Agency or organization name: DRMS <br />Page 1 of 2 <br />Permit/Job #: C1992081 <br />Abbreviation: None <br />Filename: C081 -502 <br />HOURLY EQUIPMENT COSTShift basis: 1 per day <br />- Scraper: Cat 637G <br />- Dozer: NA <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: CAT 14M <br />-Water Truck: Water Tanker, 10,000 Gal. <br />Cost Breakdown: Scraner Work Team Sunnnrt Fniiinmenr MainfPnanrP Fm,i --f <br />Total work team cost/hour: $1,649.70 <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />NA <br />NA <br />25 <br />25 <br />Ownership cost/hour: <br />$103.90 <br />NA <br />NA <br />NA <br />$39.30 <br />$54.68 <br />Operating cost/hour: <br />$232.77 <br />NA <br />NA <br />NA <br />$16.78 <br />$29.31 <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$24.95 <br />NA <br />NA <br />NA <br />$24.47 <br />$38.70 <br />Unit Subtotals: <br />$361.62 <br />NA <br />NA <br />NA <br />$80.54 <br />$122.68 <br />Number of Units: <br />4 <br />0 <br />0 <br />0 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$1,446.48 <br />Support: <br />$0.00 <br />Maint: <br />$203.22 <br />Total work team cost/hour: $1,649.70 <br />MATERIAL QUANTITIES <br />Initial volume: 112,900 <br />CCY Swell factor: 1.000 <br />Loose volume: 112,900 <br />LCY <br />Source of estimated volume: <br />Seneca II -W Permit Page 25 -1 -22 <br />Source of estimated swell factor: <br />Cat Handbook <br />HOURLY PRODUCTION <br />Scraner Bowl (volume) Basis: <br />Material weight: 2,550 lbs /LCY <br />Struck Volume: 24.00 <br />LCY <br />Material description: Gravel - Dry <br />Heaped Volume: 34.00 <br />LCY <br />Rated Payload: 81,600 pounds <br />Average Volume: 29.00 <br />LCY <br />Payload Capacity: 32.00 LCY <br />Adjusted Capacity: 29.00 <br />LCY <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.