Laserfiche WebLink
Mobilization Worksheet Cont'd Task # 046 Page 2 of 2 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: HAYDEN <br />Total one -way travel distance: 10.00 miles <br />Average Travel Speed: 25.00 mph <br />Total Non - Roadable Mob/Demob Cost * <br />`* two round trips with haul rig. <br />Total Roadable Mob/Demob Cost ** <br />** one round trip, no haul rig: <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Non - Roadable <br />Equipment <br />Roadable <br />Equipment <br />0.40 <br />0.40 <br />0.40 <br />0.40 <br />0.50 <br />NA <br />0.50 <br />NA <br />1.80 <br />0.80 <br />$3,533.70 <br />$44.41 <br />Total job time: 3.60 Hours <br />Total job cost: $3,578.11 <br />CIRCES Cost Estimating Software <br />