Laserfiche WebLink
Page 1 of 3 <br />TRUCK/LOADER TEAM WORK <br />Task description: Clean Sediment from Ponds Once During Liability Period <br />Site: Hayden Gulch Loadout Permit Action: SL Permit/Job #: C1992081 <br />PROJECT IDENTIFICATION <br />Task #: 040 State: <br />Date: 6/18/2012 County: <br />User: JLE <br />Agency or organization name: <br />HOURLY EQUIPMENT COST <br />Colorado <br />Routt <br />DRMS <br />Truck Loader Team - Truck: Generic 8 -10 cy, 6x4 <br />- Loader: Cat 336D L 10' -6" Stick <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />NA <br />NA <br />NA <br />NA <br />Abbreviation: None <br />Filename: C081 -040 <br />Shift basis: 1 per day <br />Cost Breakdown: Truck/Loader Team Sunnort Eiminment Maintenance Eouinment <br />Total work team cost/hour: $512.05 <br />MATERIAL OUANTITIES <br />Initial volume: 1,874 CCY Swell factor: 1.135 <br />Loose volume: 2,127 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity <br />Truck Payload (weight) Basis: <br />Material weight: 2,700 Pounds/LCY <br />Description: Earth -Wet excavated <br />Rated Payload: 27,280 Pounds <br />Payload Capacity: 10.10 LCY <br />CIRCES Cost Estimating Software <br />Truck <br />Excavator <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />100 <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$9.13 <br />$42.44 <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$49.72 <br />$77.83 <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$0.00 <br />$38.67 <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$58.85 <br />$158.95 <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />6 <br />1 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: $512.05 <br />Support: $0.00 <br />Maint: $0.00 <br />Total work team cost/hour: $512.05 <br />MATERIAL OUANTITIES <br />Initial volume: 1,874 CCY Swell factor: 1.135 <br />Loose volume: 2,127 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity <br />Truck Payload (weight) Basis: <br />Material weight: 2,700 Pounds/LCY <br />Description: Earth -Wet excavated <br />Rated Payload: 27,280 Pounds <br />Payload Capacity: 10.10 LCY <br />CIRCES Cost Estimating Software <br />