Laserfiche WebLink
Reveg Worksheet Cont'd <br />MULCHING and MISCELLANEOUS <br />Materials <br />Task # 032 <br />Page 2 of 2 <br />Total Seed Application Cost /Acre $90.11 <br />Description <br />Units / <br />Acre <br />Unit <br />Cost / Unit <br />Cost /Acre <br />Straw, delivered MEANS 3125 14.16 12001 <br />2.00 <br />TON <br />$164.00 <br />$328.00 <br />Total Mulch Materials Cost/Acre <br />$ <br />Totals Nursery Stock Cost / Acre <br />$0.00 <br />$328.00 <br />Application <br />Description <br />Cost /Acre <br />Crimping, with tractor (DMG survey data} <br />$65.89 <br />Power mulcher (MEANS 32 91 13.16 0250) <br />$79.71 <br />Total Mulch Application Cost/Acre <br />$145.60 <br />NURSERY STOCK PLANTING <br />Common Name <br />No / <br />Acre <br />Type and Size <br />Planting <br />Cost <br />Fertilizer <br />Pellet Cost <br />Cost /Acre <br />$ <br />Totals Nursery Stock Cost / Acre <br />$0.00 <br />JOB TIME AND COST <br />No. of Acres: 2.4 Cost /Acre: $746.72 <br />Estimated Failure Rate: 20% Cost /Acre *: $579.98 <br />*Selected Replanting Work Items: SEEDING,MULCHING <br />Initial Job Cost: <br />Reseeding Job Cost: <br />Total Job Cost: <br />Job Hours: <br />$1,792.13 <br />$278.39 <br />$2,070.52 <br />2.40 <br />CIRCES Cost Estimating Software <br />