Laserfiche WebLink
Page 1 of 2 <br />SCRAPER TEAM WORK <br />Task description: Replace Topsoil on Rail Spur <br />Site: Hayden Gulch Loadout Permit Action: SLl Permit/Job #: C1992081 <br />PROJECT IDENTIFICATION <br />Task #: 025 State: Colorado <br />Date: 6/15/2012 County: Routt <br />User: JLE <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />Abbreviation: None <br />Filename: C081 -025 <br />COSTShift basis: 1 per day <br />- Scraper: <br />- Dozer: <br />Cat 637G w/ ush- ull <br />NA <br />Support Equipment -Load Area: <br />-Dump Area: <br />NA <br />NA <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />NA <br />NA <br />Cost Breakdown: Scraoer Work Team Sunnort Equinment Maintenance Equipment <br />Total work team cost/hour: $723.24 <br />MATERIAL OUANTITIES <br />Initial volume: 6,714 CCY Swell factor: 1.125 <br />Loose volume: 7,553 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: 2,550 lbs /LCY <br />Material description: Earth - Dry packed <br />Rated Payload: 81,600 pounds <br />Payload Capacity: 32.00 LCY <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$103.90 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$232.77 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$24.95 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$361.62 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />I Work: <br />$723.24 <br />Support: <br />$0.00 <br />Maint: <br />L $0.00 <br />Total work team cost/hour: $723.24 <br />MATERIAL OUANTITIES <br />Initial volume: 6,714 CCY Swell factor: 1.125 <br />Loose volume: 7,553 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: 2,550 lbs /LCY <br />Material description: Earth - Dry packed <br />Rated Payload: 81,600 pounds <br />Payload Capacity: 32.00 LCY <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />24.00 <br />LCY <br />Heaped Volume: <br />34.00 <br />LCY <br />Average Volume: <br />29.00 <br />LCY <br />Adjusted Capacity: <br />29.00 <br />LCY <br />CIRCES Cost Estimating Software <br />