Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 020 Page 2 of 2 <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />0.800 <br />(FND -RF) <br />1.000 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.868 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.3890 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />668.65 LCY/hr <br />1337.3 LCY /hr <br />Fleet size: 2 Dozer(s) <br />Unit cost: $0.497/LCY <br />Total job time: <br />Total job cost: <br />8.41 Hours <br />$5,587.41 <br />CIRCES Cost Estimating Software <br />