Laserfiche WebLink
Page 1 of 2 <br />BULLDOZER WORK <br />Task description: Regrade Rail Loop Pond <br />Site: Hayden Gulch Loadout Permit Action: SLI Permit/Job #: C1992081 <br />PROJECT IDENTIFICATIOIN <br />Task #: 019 <br />Date: 6/15/2012 <br />User: ME <br />State: Colorado <br />County: Routt <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D l OT - 10SU <br />Horsepower: <br />574 <br />Blade Type: <br />Semi - Universal <br />Attachment: <br />3 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Abbreviation: None <br />Filename: 0081 -019 <br />Cost Breakdown: <br />Source <br />Initial Volume: <br />3,000 <br />Swell factor: <br />Utilization % <br />Ownership Cost/Hour: <br />$111.83 <br />NA <br />Operating Cost/Hour: <br />$181.78 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.49 <br />NA <br />Total unit Cost/Hour: $332.09 <br />Total Fleet Cost/Hour: $332.09 <br />MATERIAL QUANTITIES <br />Source <br />Initial Volume: <br />3,000 <br />Swell factor: <br />1.125 <br />Loose volume: <br />3,375 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />150 feet <br />1.243.2 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: -10% <br />Average site altitude: 6,400 feet <br />Material weight: 2,650 lbs /LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor <br />Source <br />Operator Skill: 0.750 <br />(AVG.) <br />Material consistency: 0.900 <br />(CAT HB)) <br />Dozing method: 1.000 <br />(GEN.) <br />CIRCES Cost Estimating Software <br />