i <br /> 15. Enclosed is Dr. Pendleton's memo concerning subsidence monitoring. As he <br /> states in the memo, Mid-Continent needs to commit to monitoring for the <br /> permit end requirment during the summer of 1988. Also, if double-pass <br /> longwall mining is requested for this application, a plan must be <br /> submitted to allow for instigation of monitoring over that panel in an <br /> accessible season of the year. <br /> 16. The bond is currently being reviewed. If any issues arise, notifications <br /> will be sent. <br /> 17. Closing of the drift openings at the portals is described as sealing with <br /> 25 feet of concrete rubble. The MSHA site actually refers to a solid <br /> wall . The narrative should be revised to coincide with the bonding <br /> scenario presented September 19, 1986 which states that a cement or <br /> cement block plug will be placed in each of the upper portals. <br /> 18. Several mentions have been made that the rock tunnel pile will not be <br /> reclaimed in expectation of completing the tunnel through to Huntsmans <br /> Ridge. It is my understanding that the rock tunnel pile is not currently <br /> approved for the increased material that would come from the expansion <br /> through the Huntsmans Ridge. This needs to be clarified within the <br /> narrative of the permit application. <br /> The status of stipulations is enclosed as an attachment. Please call if you <br /> have any questions. <br /> Sincerely, <br /> Candace M. Thompson <br /> Hydrologist <br /> CMT/vjr <br /> cc: Bob Liddle <br /> 4895F <br />