Laserfiche WebLink
i 1 0 _ = 11 54 g 'L+` 945 -'?4 1,ELQHE' _ B P L C 0 12, <br /> AA RECLAMATION - BENCHES <br /> access to the crest with any kind of equipment. Further, even if possible, <br /> additional disturbance to the area above the crest of the cut would be <br /> destabilizing to the weathered rock and coliuviurn of the undisturbed ground <br /> there. <br /> Around the perimeter of the bench, the angle of the edge will be flattened to a <br /> slope of 1.5:1, cr, flatter. Material taken from the perimeter of the bench will be <br /> used in construction of the buttress along the cut. <br /> In order to increase the stability of the fill, a berm will be constructed above the <br /> flattened slope around the outside perimeter of the bench. Further back, and <br /> within the flattened area of the bench, a small ditch will be constructed. The <br /> objective is to improve surface drainage so as to prevent surface water from <br /> entering the fill. <br /> The area of the bench w;li be scarified and seeded with the approved 10,000' <br /> seed rnix. <br /> Nov 7 19$� <br /> Mjt4E© LAt1D 1E10� <br /> �ZEOLAl�I�Tl4N t� <br /> i A <br />