My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (219)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (219)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 9:49:03 AM
Creation date
6/19/2012 11:11:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Memo to Candace Thompson <br /> Re: Coal Basin Mines - Subsidence <br /> page 5 <br /> potentially be affected by ground subsidence. This inspection <br /> shall encompass all areas bounded by projecting the boundaries of <br /> underground extraction upward from the mined seam to the ground <br /> surface along an angle of draw of 20.5 degrees from vertical . The <br /> company shall submit a report summarizing the results of the <br /> annual subsidence inspection, prior to December 31st of each year. <br /> (2 ) Prior to the commencement of double-pass longwall extraction or <br /> considera-tion by the Division of any future requests for amendment <br /> of the Coal Basin mine plan which involve expansion of the <br /> potentially subsided area, Mid-Continent Resources shall revise <br /> the subsidence report prepared by Dr. Bruce Collins and submitted <br /> in December of 1985. This report shall be revised to reflect the <br /> subsidence data obtained during the 1988 subsidence resurvey and <br /> any subsequent resurveys and shall be submitted to the Division <br /> for review. <br /> (3) In the event that double-pass longwall extraction is initiated at <br /> Coal Basin Mines, the Division will require Mid-Continent <br /> Resources to resume an appropriate monument surveying subsidence <br /> monitoring program, in order to determine the subsidence factor <br /> and angle of draw above the relatively untested double-pass <br /> extraction technique. <br /> cc: Jim Stevens <br /> r# <br />
The URL can be used to link to this page
Your browser does not support the video tag.