Laserfiche WebLink
App. II-B-4 <br /> 7 / 11 / 85 Rock Tunnel Sealing Plan. Stip. No. 4. <br /> 7 / 11 / 85 Muck Pond. <br /> 7 / 11 / 85 Sediment Pond Cleaning on Sutey Waste Pile. <br /> 7 / 11 / 85 Enlarged Culvert - No. 5 Mine Road. <br /> 7 / 24 / 85 Rill and Gully Repair Program. <br /> 10 / 16 / 85 New Powerline, Fan Move. <br /> 11 / 14 / 85 Power Poles, Tree Removal. <br /> MR-1986 <br /> 2 /20 / 86 MR-1. Decrease of Berm Width for Sutey Topsoil Area.. <br /> 6/ 6 / 86 MR-2. Inspection Frequency Reduction. <br /> 7 /2 / 86 MR-3. Relocation of Powerline. <br /> 12 / 7 / 86 MR-4. Satisfaction of Stip. No. 1 to MR-1. <br /> MR-1987 <br /> 7 / 27 / 87 MR-5. Rock Tunnel Pond A Spillway. <br /> 10 / 15 / 87 MR-6. Temporary Seed Mix. <br /> 10 /26 / 87 MR-7.Sutey Conveyor Area Expansion. <br /> - MR-1988 <br /> 3 / 15 / 88 MR-8. Placement of Pond Cleanings on Rock Tunnel Waste <br /> Disposal Area. <br /> 3 / 23 / 88 MR-9. Strip & Stockpile Topsoil for Sutey Expansion. <br /> 6 /1/ 88 MR-10. Ditch Design. Sutey Conveyor. <br /> 6/30/88 MR-11. Winter Storage - Non-Coal Waste. <br /> 8/12/88 MR-12. Install Ventillation Fan - #2 Mine. <br /> 10/20/88 MR-13. Extend Sutey Topsoil Pile. <br /> 4 <br />