Laserfiche WebLink
The haul/access and light use roads described in Volume 1 , Chapter II, <br /> Section II-B, pages 16-21 of the permit renewal application package are in <br /> part beyond the boundaries of the approved permit area. As a result the <br /> Division makes the following funding, as required by Rule 2.06.10(3) , that <br /> in addition to meeting all other applicable requirements of these rules <br /> (regulations of the Colorado Mined Land Reclamation Board for Coal Mining) , <br /> that portion of the Coal Basin Mine's operations consisting of the haul/access <br /> and light use road system outside the permit area will be conducted in <br /> compliance with the requirements of Rule 4,.28. <br />