Laserfiche WebLink
-5- <br /> to exist among soil depths, then multiple comparison tests (e.g. Duncan's <br /> multiple range test) would be used to determine the minimum soil depth needed <br /> to produce the revegetati on results desired. <br /> 2. Schedule <br /> Site selection, including a preliminary soil depth survey, and vegetation <br /> sampling will be done between July 15 and August 1%, 1983. Data analysis <br /> will be completed by September 15. <br /> 3. Reports <br /> The final report containing an analysis, discussion, and summary of <br /> the data will be submitted by October 1 , 1983. Recommendations as appropriate <br /> will also be included in this report. <br /> 4. Budget <br /> The budget for the proposed project is presented below. Native Plants <br /> would provide all the labor, materials, and supervision needed for the sampling <br /> and data analysis. The 1980 baseline vegetation data should be provided to <br /> Native Plants for the aspen shrubland vegetation type and knowledgeable company <br /> personnel should be made available for assistance in sample site selection. <br />