Laserfiche WebLink
• -8- <br /> The fallowing is a summary of the Division's reclamation cost estimate. <br /> Facilities Removal $ 73,800.00 <br /> Backfilling and Grading 146,41 .00 <br /> 6.00 a <br /> Topsoil Replacement 4110 .00 <br /> Portal Sealing 1 , <br /> Revegetation 6, 156.00 <br /> Subtotal $326,568.00 <br /> 10% administrative Cost 32,657.00 <br /> TOTAL $359.225.00 <br /> The Division's reclamation cost estimate for the rock tunnel to wash plant <br /> conveyor system is $359,225.00. <br /> /th <br /> Doc. No. 2261 <br />