My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (215)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (215)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 9:43:00 AM
Creation date
6/19/2012 10:34:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GEO-HYDRO CONSULTING, INC. 9485 West Colfax Avenue <br /> Consultants in Geotechnical and Denver, Colorado 80215 <br /> Hydrological Engineering Telephone(303)232-6324 <br /> July 25 , 1984 <br /> Mined Land Reclamation Division <br /> 1313 Sherman Street <br /> Denver , CO 80203 REcEIV Attn . : Mr. Jim Perron E� <br /> Reclamation Specialist <br /> JUL 2 6 1984 <br /> MIN <br /> 0 LAND R CkAMATioN DIVISION <br /> C010, Dept. of Natural Resourcc <br /> es <br /> aantIcmen : <br /> Enclosed please find our revisions and additions to <br /> our design of the Sutey refuse pile for Mid- Continent Re- <br /> sources , Inc . With reference to your letter of July 12 <br /> to Mr . Doug Bowman , concerning the Preliminary Aoeyu-cy <br /> review Comments - Sutey Refuse Pile Permit Revision File <br /> t\o . C-017-81 , we have addressed all of the changes under <br /> the headings "Roads - Rule 2 . 05 . 3 (3 ) (c ) ", "Ponds , Im- <br /> poundments , Diversions - Rule 2 . 05 . 3 (4) " , and "Coal Pro- <br /> cessing Waste - Rule 4 . 10' . We have provided only the sheets <br /> to be added or substituted into the report , and three complete. <br /> sets )f construction drawings . Your existing report copies <br /> should be updated according to the following schedule : <br /> Stability Analysis , Pile Volume , and Surface Water <br /> calculations : <br /> Sheer 3 : Substitute new conveyor ditch calculations <br /> for old ones . <br /> Sheet 4 : Su�Jstltutenew pages for old ones only for <br /> sheet 1 and sheet 3 of design of west and <br /> east collection ditches . <br /> Sheet 5 : Substitute new pages 1 and 2 of sedimentation <br /> ponds ' capacity for old ones . Add three new <br /> sheets ( including map ) of soil loss cal - <br /> culations immediately behind pages 1 and 2 of <br /> sedimentation por:ds ' capacity . <br />
The URL can be used to link to this page
Your browser does not support the video tag.