J <br /> STATEMENT OF WORT: <br /> Contractor shall shall provide such personnel , equipment and supervision <br /> as shall be necessary to construct two (2) sediment ponds generally <br /> as shown on GEO-HYDRO drawings 1028-0139 sheets 495 and applicable <br /> sections of 9. <br /> ADDITIONAL SPECIFICATIONS <br /> 1 . Capacity of the "upper pond" shall be 2. 2 acre feet or greater. <br /> 2. Capacity of the "lower pond" shall be 2. 2 acre feet or greater. <br /> All vegitation shall be removed from areas to be disturbed or <br /> used and disposed of as follows: <br /> A. Brush and slash shall be transported to a stacking/disposal <br /> area located within 1000 yards of the site as designated by <br /> the Mid-Continent Engineer-in-charge. <br /> B. Stump=, roots and the like shall be transported to and spread <br /> on reclaimed portions of the old refuse pile south of preparation <br /> plant and Dutch CreeE::. <br /> C. Wood material 3 inches and larger shall be cut into lengths <br /> approximately 8 feet long and transported to the entrance of <br /> the small side canyon adjacent to the Disney trailer site and <br /> staked in neat cribs approximately 6 foot by 8 foot by 4 feet <br /> high, on previously disturbed land. <br /> D. The Mid-Continent Engineer-in-charge is authorized to approve <br /> altenaltive disposal of vegitation and to make appropriate price <br /> adjustment therefor. <br /> 4. Contractor shall furnish as part of this contract all pond spillways <br /> and dewatering devices including approved manually controlled dewatering <br /> gates. <br /> 5. Contractor shall be responsible for all rerquired engineering <br /> tests and inspections and shall furish Mid-Continent with the report <br /> of a Registered Professional Engineer certifying that ponds have <br /> been construc-ced in accordance with good engineering practice and <br /> the GEO-HYDRO design specifications. <br /> 6. Exact layout of the ponds and structures shall be conformed to <br /> the site based on actual survey with the approval of the Mid-Continent <br /> Engineer-in-charge. <br /> 7. Preparation of all construction materials, if any, and construction <br /> of the rip-rap spillways for a distance of 30 feet down stream from <br /> the downsteam toe of the pond dike are for contractors account and <br /> part of this contract. <br /> 8. Work shall begin within 10 days of the date of this contract <br /> and shall be completed within 30 days of the date of this contrast . <br />