My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-05-25_PERMIT FILE - C1982056A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982056A
>
2012-05-25_PERMIT FILE - C1982056A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:58:11 PM
Creation date
6/19/2012 9:12:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
5/25/2012
Doc Name
Exploration Drilling Information
Section_Exhibit Name
Exhibit 52 Exploration Drilling Information
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 Assumes 5 7/8" inch diameter drill hole = 0.1883 ft3 /ft. Occasionally a 5 5/8" diameter hole is drilled = 0.1726 ft3 /ft. <br />2 Assumes deeper holes (greater than 800 feet) will be plugged with 6 cubic yards of cement (about 760 feet) - concrete trucks can deliver 6yds of concrete to off -road sites; moderately deep holes (between 500 and 800 feet) will be plugged with 4 to 5 cu <br />3 Assumes $12.25 per sack and 9.5 sacks per cubic yard. <br />4 Assumes $9 per sack and 0.032yds3 per sack; 50 lb sacks <br />5 Assumes $7.25 per sack and 2.2 cubic feet per sack, approximately 11 sacks per cubic yard. <br />6 Cement and plug labor cost: Assumes 6 hours per hole at $395 per hour. <br />7 Assumes $2.25 per LYD3 <br />8 Utilizes either D4 tracked dozer or backhoe: Assumes 3 hours per pad at $95 per hour. <br />9 Seed is broadcast: Assumes $140 per acre. <br />10 Assumes 50% failure rate: Reseeded at $70 per acre. <br />1 I Assumes seed application will take 2 hours at $80 per hour. <br />12 Hole drilled to Wolf Creek Coal Seam - (NA for 2012 Twentymile Planning) <br />13 Cost breakdown from CIRCES Estimating Software <br />14 Cost assumes a separate move for each drillhole location and each move will take approximately one -half hour <br />15 Linear feet per cubic foot for 5 7/8" hole is 5.312 <br />TABLE 2 - MR12 -261 <br />TWENTYMILE EXPLORATION 2012 <br />RECLAMATION <br />COST ESTIMATE <br />Hole <br />Data <br />Drill Hole <br />Plugging <br />Reclaim Drill Pads <br />Revegetation <br />Est Depth <br />Drill Hole <br />3 <br />Vds Cement/ <br />Cement Cost <br />Vds3 Plug Gel <br />Bentonite <br />Chips Cost <br />, <br />Plug Gel Cost <br />Cost to Seal & <br />Drill Pad <br />Avg <br />�, <br />Disturbed <br />Pad Reclamation <br />, <br />Pad Regrade <br />Revel; <br />Revel; Fail <br />Reie g Cost <br />€. <br />Re%e g Fail Reseed <br />6 <br />Total Reclaim <br />Hole ID <br />(ft) <br />l 3 <br />Volume (yd) <br />Hole' <br />Ft Cemented <br />3 ' <br />($120 /yd) <br />or Bentonite <br />(5111b bag <br />c <br />($I(I(I /110)' <br />Plul;� <br />(7S'x75' = <br />Disturbed <br />Per Pad <br />3 <br />7 <br />(Cut/Fill /Backrill) <br />e <br />and Topsoil <br />, <br />Cost <br />s <br />Reseed Cost <br />(Labor & <br />�� <br />Cost (Labor & <br />ii <br />Cost <br />Chips /Hole <br />(drillers fee) <br />0.15 acres) <br />Depth (ft) <br />(yd s) <br />Equip.) <br />Equip.) <br />0.032 yd')a <br />TCW008 <br />1 1,400 <br />9.8 <br />6.0 <br />861 <br />$720 <br />3.8 <br />N/A <br />$376 <br />$2,370 <br />0.15 <br />0.5 <br />104 <br />$234 <br />$285 <br />$21.00 <br />$10.50 <br />$160 <br />$160 <br />$4,337.25 <br />TCW009 <br />1,400 <br />9.8 <br />6.0 <br />861 <br />$720 <br />3.8 <br />N/A <br />$376 <br />$2,370 <br />0.15 <br />0.5 <br />104 <br />$234 <br />$285 <br />$21.00 <br />$10.50 <br />$160 <br />$160 <br />$4,337.25 <br />TCWO10 <br />1,350 <br />9.4 <br />6.0 <br />861 <br />$720 <br />3.4 <br />N/A <br />$342 <br />$2,370 <br />0.15 <br />0.5 <br />104 <br />$234 <br />$285 <br />$21.00 <br />$10.50 <br />$160 <br />$160 <br />$4,302.38 <br />TCWO11 <br />1,300 <br />9.1 <br />6.0 <br />861 <br />$720 <br />3.1 <br />N/A <br />$307 <br />$2,370 <br />0.15 <br />0.5 <br />104 <br />$234 <br />$285 <br />$21.00 <br />$10.50 <br />$160 <br />$160 <br />$4,267.50 <br />TCW012 <br />1,575 <br />11.0 <br />6.0 <br />861 <br />$720 <br />5.0 <br />N/A <br />$498 <br />$2,370 <br />0.15 <br />0.5 <br />104 <br />$234 <br />$285 <br />$21.00 <br />$10.50 <br />$160 <br />$160 <br />$4,45929 <br />TCP002 <br />1,525 <br />10.6 <br />6.0 <br />861 <br />$720 <br />4.6 <br />N/A <br />$464 <br />$2,370 <br />0.15 <br />0.5 <br />104 <br />$234 <br />$285 <br />$21.00 <br />$10.50 <br />$160 <br />$160 <br />$4,424.42 <br />E ui ment Mobilization/Demobilation 13,14 <br />Mob/Demob - Pad Construction (D9 Dozer); cost/hr /fleet ($313.25/hour) <br />$156.63 <br />$2,349.45 <br />Mob/Demob - Pad Reclamation (D9 Dozer), cost/hr <br />/fleet ($313.25/hour <br />$156.63 <br />$2,349.45 <br />Mob/Demob - Pad Reclamation (Seeder); cost/hr /fleet ($205.56 hour) <br />$102.78 <br />$1,541.70 <br />8,550 <br />36.0 <br />5163 <br />$4,320 <br />23.6 <br />$2,363 <br />$14,220 <br />0.9 <br />1.0 <br />625 <br />$1,406 <br />$1,710 <br />$126.0 <br />$63.0 <br />$960 <br />$960 <br />$32,368.68 <br />1 Assumes 5 7/8" inch diameter drill hole = 0.1883 ft3 /ft. Occasionally a 5 5/8" diameter hole is drilled = 0.1726 ft3 /ft. <br />2 Assumes deeper holes (greater than 800 feet) will be plugged with 6 cubic yards of cement (about 760 feet) - concrete trucks can deliver 6yds of concrete to off -road sites; moderately deep holes (between 500 and 800 feet) will be plugged with 4 to 5 cu <br />3 Assumes $12.25 per sack and 9.5 sacks per cubic yard. <br />4 Assumes $9 per sack and 0.032yds3 per sack; 50 lb sacks <br />5 Assumes $7.25 per sack and 2.2 cubic feet per sack, approximately 11 sacks per cubic yard. <br />6 Cement and plug labor cost: Assumes 6 hours per hole at $395 per hour. <br />7 Assumes $2.25 per LYD3 <br />8 Utilizes either D4 tracked dozer or backhoe: Assumes 3 hours per pad at $95 per hour. <br />9 Seed is broadcast: Assumes $140 per acre. <br />10 Assumes 50% failure rate: Reseeded at $70 per acre. <br />1 I Assumes seed application will take 2 hours at $80 per hour. <br />12 Hole drilled to Wolf Creek Coal Seam - (NA for 2012 Twentymile Planning) <br />13 Cost breakdown from CIRCES Estimating Software <br />14 Cost assumes a separate move for each drillhole location and each move will take approximately one -half hour <br />15 Linear feet per cubic foot for 5 7/8" hole is 5.312 <br />
The URL can be used to link to this page
Your browser does not support the video tag.