Laserfiche WebLink
REASON FOR INSPECTION: <br />Normal I &E Program <br />BOND CALCULATION TYPE: <br />Complete Bond <br />BOND AMOUNT: <br />$68,984.25 <br />DATE OF COMPLAINT: <br />NA <br />POST INSP. " ACTS: <br />None : <br />JOINT INSP. AGENCY: <br />None <br />WEATHER: <br />Clear <br />INSPE ;.,' S G URE: <br />SIGNATURE DATE: <br />June 18, 2012 <br />MINE NAME: <br />Bucklen Equipment Co <br />MINE/PROSPECTING ID#: <br />M -1982 -131 <br />MINERAL: <br />Sand and Gravel <br />COUNTY: <br />Weld <br />INSPECTION TYPE: <br />Monitoring <br />INSPECTOR(S): <br />Peter S. Hays <br />INSP. DATE: <br />June 6, 2012 <br />INSP. TIME: <br />13:00 <br />OPERATOR: <br />Bucklen Equipment Company <br />OPERATOR REPRESENTATIVE: <br />Mike and Randy Bucklen <br />TYPE OF OPERATION: <br />112c - Construction Regular Operation <br />COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />MINERALS PROGRAM INSPECTION REPORT <br />PHONE: (303) 866 -3567 <br />The Division of Reclamation, Mining and Safety has conducted an inspection of the mining operation <br />noted below. This report documents observations concerning compliance with the terms of the permit <br />and applicable rules and regulations of the Mined Land Reclamation Board. <br />The following inspection topics were identified as having Problems or Possible Violations. OPERATORS <br />SHOULD READ THE FOLLOWING PAGES CAREFULLY IN ORDER TO ASSURE COMPLIANCE <br />WITH THE TERMS OF THE PERMIT AND APPLICABLE RULES AND REGULATIONS. If a <br />Possible Violation is indicated, von will be notified under separate cover as to when the Mined Land <br />Reclamation Board will consider possible enforcement action. <br />INSPECTION TOPIC: Backfilling & Grading <br />PROBLEM /POSSIBLE VIOLATION: Problem: The current mine plan needs to be updated and clarified pursuant to <br />C.R.S. 34- 32.5 -112 (1)(c)(VI). The Operator must provide sufficient information to describe or identify how the <br />Operator intends to conduct the operation. <br />CORRECTIVE ACTIONS: The Operator shall submit a Technical Revision, with the required $216 revision fee, to <br />update and clarify the current approved mine plan to reflect existing and proposed activities by the corrective <br />action date. <br />CORRECTIVE ACTION DUE DATE: 8/17/12 <br />OBSERVATIONS <br />The Bucklen Equipment Company Pit was inspected by Peter Hays and TC Wait with the Division of <br />Reclamation, Mining and Safety (Division) as part of the Division's monitoring inspection program. Mr. Mike <br />Bucklen and Mr. Randy Bucklen with Bucklen Equipment Company, Inc. were present during the inspection. <br />The site was previously inspected by the Division on April 1, 2008. <br />Based on the inspection observations, the Division believes a possible violation has occurred at the Bucklen <br />Equipment Company Pit site. The Division will schedule this matter for a hearing before the Colorado <br />Mined Land Reclamation Board. A notice of possible violation and information regarding the Board hearing <br />will be sent under separate cover. <br />Page 1 of 6 <br />