My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-06-18_REVISION - C1981012
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981012
>
2012-06-18_REVISION - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:00:42 PM
Creation date
6/18/2012 10:58:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
REVISION
Doc Date
6/18/2012
Doc Name
Adequacy Response #1
From
J.E. Stover & Associates, Inc
To
DRMS
Type & Sequence
TR65
Email Name
ZTT
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Zach Tru'illo - 4 - June 15 2012 <br />12. DRMS: Please advise how potential subsidence, and impacts on <br />Containment #2, will be addressed (see Rule 2.05. 3(4)(a)(i)D)). In addition to <br />inspections of the pond, will this area be included in subsidence surveys? <br />NECC: Containment area No. 2 has not been undermined. It is over 350 feet from the <br />nearest completed workings and will therefore not be included in subsidence surveys. <br />13. DRMS: As per Mr. Ron Gehrke's email, MSHA cannot approve refuse piles <br />over abandoned openings. Please provide discussion of NECC plans to address <br />the Allen Mine portal opening in order to gain approval from MSHA to construct the <br />proposed West DWDA. <br />NECC: Please see addendum to Exhibit 43 (old Exhibit 42). As previously mentioned, <br />Exhibit 42 has been renamed and will be resubmitted as Exhibit 43. <br />14. DRMS: The Division has calculated a bond estimate required to regrade and seed <br />the West DWDA footprint. The cost estimate calculated by the Division totals <br />$70,551.08 (see attached cost estimate) compared to NECC's cost estimate of <br />$104,253.16. The Division's estimate is consistent with previous cost estimates <br />approved by both the Division and NECC. If NECC wishes to use the cost estimate <br />calculated by the Division, please submit a revised estimate that matches the <br />estimate calculated by the Division. <br />NECC: Four culverts have been added as part of this adequacy response. Exhibit 28 <br />will be updated after DRMS generates a revised estimate including the four culverts. <br />Additional Items revised: <br />1. The Soil Storage Stockpile and Topsoil Stockpile locations have been swapped <br />due to the potential conflict with the overhead power line. In order to <br />accommodate the Soil Storage Stockpile footprint, Ditch 46 -3% has been <br />rerouted to flow into D53, and then into Containment Area No. 2. Please see <br />revised Map -14. <br />2. Two culverts have been added to D41 to provide access to the DWDA during <br />construction. These culverts will be temporary and will be removed upon <br />completion of the DWDA pile. <br />3. Page 2.05 -47 was revised in order to clarify reclamation specifics for DWDA #3. <br />Sincerely, <br />Tamme Bishop, P.E. <br />Project Engineer <br />