My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-06-15_PERMIT FILE - C1981018A (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981018A
>
2012-06-15_PERMIT FILE - C1981018A (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:00:24 PM
Creation date
6/15/2012 2:30:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018A
IBM Index Class Name
Permit File
Doc Date
6/15/2012
Section_Exhibit Name
Section V. Mine Surface Facilities Reclamation Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• slope erosion, allow the reclaimed banks to blend into the existing natural terrain and allow animals <br />to graze on the sides after final reclamation. <br />Estimates of sediment from the first four refuse areas are included in Illustration 8. The results are <br />listed below. These estimates are based on the entire refuse pile being covered with bare topsoil. <br />The estimates were made using the (USLE) Universal Soil Loss Equation (see Section V.B.4), <br />Since seeding will commence soon after the topsoil is placed, these estimates are conservatively <br />higher than actually anticipated. As vegetation is established, the sediment yield per year will be <br />drastically reduced. When vegetation has been established equal to the premining growth in the <br />area, the sediment yield will be on the order of 25 times less than for bare soil as calculated. <br />Sub -area <br />Too of Pile <br />Face of Pile <br />1 <br />7.1 TPY <br />529.2 TPY <br />2 -3 <br />6.8 TPY <br />1,872.4 TPY <br />4 <br />10.5 TPY <br />1,368.4 TPY <br />The layout of the waste banks and a typical cross section are presented in Maps 76, 77, 77A, 63 <br />and 150. The last lift will not be compacted and its top 8 -12" will be scarified to enhance a <br />permeable interface for roots and water. <br />V.B.6 Post Reclamation Sediment Control Sediment Pond DP -1 which collects runoff from the <br />• D Portal Area, will be removed during the removal of the Scullion Gulch diversion system when the <br />D Portal Area is reclaimed. A series of three loose rock check dams have been constructed in the <br />Scullion Gulch stream bed and its tributaries in the D Portal Area. The loose rock check dams and <br />other sediment control measures are discussed in Section IV.J. The loose rock check dams are <br />shown on Maps 43, 44 and 46. Cross - sections and details are shown on Map 43. The three loose <br />rock check dams will be removed following successful reclamation and revegetation of the D- Portal <br />area upstream. <br />• <br />The loose rock check dams will retard streamflow and thereby minimize erosion in the reclaim @d <br />Scullion Gulch stream bed. In addition, sediment deposition will occur behind the dams during <br />runoff from small storms. It is anticipated that seepage through the rock dams will be partially <br />blinded off by sediment deposition and thereby provide a minimal amount of settling volume for <br />runoff from small storms. <br />The total storage volume behind the three check dams is 1.74 acre -feet. The 3 year average <br />sediment yield (per USLE) for the reclaimed D Portal Area is 0.51 acre -feet. The three year <br />sediment yield for the total drainage area above and including the D Portal Area is 6.02 acre -feet, <br />Thus, the reclaimed D Portal Area with the proposed contour furrowing and mulching would <br />increase the sediment load in the Scullion Gulch at the D Portal Area by only 9.3% without the <br />check dams being installed. See Illustration 22 for calculations. <br />Mid -Term Review 2002 (8/2002) V -14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.