Laserfiche WebLink
' 0 <br /> e•- .Q,��.�— - "�L LWa K�1 idi=TL'On �-- -i , rr►^ ................. _ <br /> Increased leakage will be the warning signs under the most <br /> likely failure scenarios. Monitoring during the initial life <br /> of the bulkheads will provide assurance that the functional <br /> life is not being shortened by deterioration of the bulkhead <br /> airside. <br /> SGC believes that the above discussion addresses the concerns of <br /> the Division related to the American Tunnel and Terry Tunnel <br /> bulkheads. Please contact me If this is not the case or if you <br /> have any questions on the submittal. GGC anticipates a meeting <br /> will be required with the Division to discuss the joint <br /> presentation to the Board f oz a determination as to the Board's <br /> position on the continuing discharge issue. Finalization of any <br /> issues outstanding with this T&-14 submittal could also be <br /> accomplished at that time. <br /> Sincerely, <br /> Larry Perino <br /> Superintendent-Technical Services <br /> enclosures <br /> cc: Patricia Nelson - CDH w/enclosures <br /> LP/c jm <br />