Laserfiche WebLink
SENT BY:Sunn95ide Gold CorP 09-23-93 03:34PM 30338?5310-9 303 832 8106 # 2 <br /> Responses to Division Concerns <br /> Page 12 <br /> a. Publia NOW ication and filing with the County Clerk <br /> SGC will provide documentation that the required Public Notice <br /> was published in the Sily erton Standard and the Miner and that <br /> all owners of record of surface rights to the affected land <br /> and all owner s of he affected 1 nd ecord of lands that <br /> be sent within <br /> copii esfeet <br /> of <br /> the boundary oof the <br /> Public Notice by return receipt as well as the San Juan County <br /> Board of County Commissioners. <br /> The "affected lands" are <br /> interpreted to mean the permitted <br /> Bagin s for the American <br /> Tunnel , Terry Tunnel and S <br /> A permanent filing will be made TRt14 he San Juan County Clerk <br /> and Recorder after approval <br /> 7. Removal of under round Equipmentr Facilities and Materials <br /> SGC will inspect the accessible underground workings and <br /> remove materials that may serve to contaminate the mine pool <br /> (ie transformers, light fixture ballasts and stored fuel, oil <br /> or grease) . <br /> g. Potential for Failure from Thrust <br /> Strength related concerns were addressed ndappr approved <br /> of TRtlwith e <br /> June 4, 1993 submittal requesting partial <br /> for construction of the F-Level and S-Level Brenneman <br /> bulkheads. Tne American Tunnel and Terry Tunnel bulkheads are <br /> the same design and SGC assumes the design and strength <br /> concerns have been adequately addressed with that submittal. <br /> SGC will submit long sections of the bulkhead sites after <br /> cleaning to provide assurance that adequate perimeter area <br /> irregularity exists with no adverse tapering that will affect <br /> the bulkhead's capacity for shear resistance. <br /> 9. Diversion Pipe Flow Data <br /> The time interval that the stability of the bulkhead could be <br /> compromised by the by-pass flow exceeding its capacity is <br /> relatively short- This time interva extez�cimat l s fromth3 dsys� <br /> of pour until the concrete has cured app Y <br /> After that time interval, the concrete will be strong enough <br /> to withstand any conceivable force that may develop from water <br /> head building up behind the bulkhead with an open valve. The <br /> capacity of the 1pe Will also increase or decre&se at the bypass pipe entrance andwill depending <br /> on on head available <br /> be evaluated in that light. <br />