L.R. Perino Page 16 __aril 27, 1993
<br /> REFERENCES
<br /> Abel, Jr. , J.F. , 1987, Limiting equilibrium design of open pit
<br /> slope angles: 29th Annual Mtg AZ Section SME/AIME, 30 p
<br /> Abel, Jr. , J.F. , 1993, Bulkhead design for the Sunnyside Mine:
<br /> consulting report, 54 p, Mar 10
<br /> American Concrete Institute, 1989, Building code requirements for
<br /> reinforced concrete (ACI 318-89) and commentary - ACI 318R-89:
<br /> 353 p
<br /> Brown, Adrian Consultants, Inc. , 1992, Adit plugging case
<br /> histories: Report 1288B/921105, 17p, Nov 5
<br /> Calder, P. , 1977, Perimeter blasting: Chap 7, Pit Slope Manual,
<br /> CANMET Rpt 77-14, Minister Supply & Services Canada, 82 p
<br /> Canadian Mining Jour, 1985, Anatomy of a crisis: p 10-11, Dec
<br /> Chekan, C.J. , 1985, Design of bulkheads for controlling water in
<br /> underground mines: USBM Info Circ 9020, 36 p
<br /> Einarson, D.S. & J.F. Abel, Jr. , 1990, Tunnel bulkheads for acid
<br /> mine drainage: Proc. Symp. on Unique Underground Structures, v
<br /> 2, p. 71-1 to 71-20
<br /> Farmer, I. , 1983, Engineering properties of rock: 2nd ed, Chapman &
<br /> Hall, 208 p
<br /> Garrett, W.S. & L.T. Campbell-Pitt, 1961, Design and construction
<br /> of underground bulkheads and water barriers: Commonwealth
<br /> Mining & Met Cong, 7th, S African Inst Min & Met, v 3, p 1283-
<br /> 1301
<br /> Rvapil, R. , 1965, Gravity flow of granular materials in hoppers and
<br /> bins - II. coarse material: Intl Jour Rock Mech & Mining Sci,
<br /> v 2, p 277-304
<br /> Lindeburg, M.R. , 1989, Civil engineering reference manual: fifth
<br /> ed, Professional Publications, Inc. , 646 p
<br /> Loofbourow, R.L. , 1973, Underground bulkheads and plugs: Section
<br /> 26.7.4, Ground water and ground-water control in SME Mining
<br /> Engineering Handbook, I.A. Given ed, p 26-46 - 26-48
<br /> Louw, A. , 1970, Ordeal by water: Mining Cong Jour, Part I, p 43-56,
<br /> Mar; Part II, p 99-103, Apr
<br />
|