Laserfiche WebLink
V sss <br /> WVELBOKN DUFFORD BROWN £3 TOOLEY, P.C. <br /> ATTORNEYS AT LAW <br /> ROBERT F WELBORN SUITE 1700 KEITH D TOOLEY <br /> PHILIP G DUFFORD SCOTT <br /> THOMAS G.BROWN 1700 BROADWAY MARLA J. VALDEZCKY <br /> DALE TOOLEY (1933-1985) DENVER, COLORADO 8 02 9 0-1701 MARLA OE. TRAND <br /> KAREN OSTRANDER-KRUG <br /> DAVID W FURGASON TELEPHONE (303) 861-8013 TERRY JO EPSTEIN <br /> WILLIAM C. ROBB THOMAS E.J HAZARD <br /> JOHN F. WELBORN FACSIMILE (303) 832-3804 <br /> ROMAN C PIBL <br /> BEVERLY J.OUAIL y/ /^ <br /> RICHARD L.FANYO t?(A1 /y 77 3 7e <br /> PHILLIP D. BARBER / / <br /> GREGORYA RUEGSEGGER <br /> JOHN F MECK May 26, 1993 <br /> RANDALLJ FEUERSTEIN <br /> S. KIRK INGEBRETSEN SPECtAL COUNSEL <br /> STEPHEN J. SULLIVAN �'� 'i" MORRIS B HECOX,JR. <br /> DOUGLAS P. RUEGSEGGER JAMES E.CARPENTER <br /> EDWARD D.WHITE ` CRAIG 8 SHAFFER <br /> PEGGY J ANDERSON MARC A.CHORNEY <br /> 6 <br /> HAND DELIVERED <br /> Mr. J. David Holm, Director <br /> [)MS10i'I )i Cvui�eta;`•7 a.aeIJIU'�y <br /> (Water Quality Control Division <br /> Colorado Department of Health <br /> 4210 E. llth Avenue <br /> Denver, CO 80220 <br /> Re: Sunnyside Gold/Reclamation Issues �- <br /> Dear Mr . Holm: <br /> Representatives of Sunnyside Gold have had several joint <br /> meetings, beginning about a year ago, with your staff and with <br /> the Division of Minerals and Geology regarding final reclama- <br /> tion issues at the Sunnyside Mine in San Juan County. The <br /> reclamation permit is in the status of temporary cessation, and <br /> major reclamation activities have been ongoing at the property <br /> for several years, including reclamation of historic tailings <br /> ponds and reclamation of the Lake Emma area. The reclamation <br /> permit has included, and still includes, the conceptual <br /> plugging of the American Tunnel as part of the final <br /> reclamation plan. (See Enclosure No. 1) The company has <br /> engaged in substantial technical studies, as to the placement, <br /> design, and feasibility of plugging the tunnel, which have been <br /> provided to your staff and to the Division of Minerals and <br /> Geology as follows : <br /> • Simon Hydro-Search, February 11, 1992 <br /> Preliminary Characterization of the Hydrology and <br /> Water Chemistry of the Sunnyside Mine and Vicinity, <br /> San Juan County, Colorado. <br /> • John F. Abel, Jr. , Mining Engineer, March 10, 1993 <br /> Bulkhead Design for the Sunnyside Mine, Sunnyside <br /> Gold Corporation, An Echo Bay Company <br /> • Simon Hydro-Search, March 12, 1993 <br /> Evaluation of Hydraulic and Hydrochemical Aspects of <br /> Proposed Bulkheads, Sunnyside Mine, San Juan County, <br /> Colorado . <br /> Additional copies can be provided. <br />