My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-03-22_REVISION - M1977378
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977378
>
1993-03-22_REVISION - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2021 2:19:29 PM
Creation date
6/15/2012 6:41:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
REVISION
Doc Date
3/22/1993
Doc Name
Bulkhead Design
From
John F. Abel, Jr.
To
Sunnyside Gold Corp
Type & Sequence
TR14
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sunnyside Gold Corp. Page 4 March 10, 1993 <br /> Table 1. Sunnyside Mine bulkhead design conditions and flexural <br /> factors of safety <br /> Bulkhead Design Bulkhead Rebar Reinforcement Design Actual <br /> Tunnel Head Design Size Spacing Factor Factor <br /> Ident. feet Length in. of of <br /> (psi) feet Safety Safety <br /> American 1550 25 #10 7 1. 01 1.57 <br /> Tunnel (670) <br /> 13 x 13 ft <br /> F-Level 650 8 #10 7 1. 03 1. 60 <br /> Terry (280) <br /> Tunnel <br /> 11 x 11 ft <br /> F-Level 630 8 #10 9 1. 01 1.57 <br /> Brenneman/ (270) <br /> Sunnyside <br /> Connection, 10 x 10 ft <br /> B-Level 70 3 #6 12 1. 14 1.77 <br /> Brenneman/ (30) <br /> Sunnyside <br /> Connection, 9 x 9 ft <br />
The URL can be used to link to this page
Your browser does not support the video tag.