Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />Mine: New Elk Pond 6 <br />NPDES ID. No.: None <br />Inspection Period: First Quarter 2012 <br />Inspection Date: 03/31/12 <br />General Description or Reference to Site Plan: <br />Pond 6 is a non - discharging facility designed to contain plant processing water. The plant has <br />been idle since 1996 and the pond is now used to dewater other ponds prior to clean -out. <br />EMBANKMENT <br />1). Adequacy of the vegetative Dover: Excellent Moderate <br />2). Erosion forming Gullies: <br />3). Is wave action causing erosion: <br />On the Upstream embankment? Yes No (� <br />4). Erosion of the downstream toe of the embankment? Yes No C.— <br />Cause of erosion can be attributed to: <br />5). Is seepage occurring through the dam? <br />Could this seepage cause potential instability? <br />SEDIMENT STORAGE CAPACITY <br />1). Has the design storage capacity of the reservoir been surpassed? <br />Yes <br />Explain: <br />OTHER OBSERVATIONS: ! e"vrt is 4Ac <br />Pike 5 fqi ,tiro D <br />MSHA Qualified Impounddrn t ector <br />Date <br />CDMR Rule 4.05.9(17) <br />Extensive Some Few <br />Yes No (� <br />QS f rr / c2 q <br />WIT T tc ri t/OE: /�/ / s <br />Poor <br />