Laserfiche WebLink
DIVISION OF MINERALS AND GEOLOGY <br /> GENERAL CONDITIONS FOR PURCHASE ORDERS <br /> 4. INSURANCE <br /> 1. DEFINITIONS <br /> The Contractor is required to procure and maintain the <br /> OWNER or STATE - the Director of the State of Colorado insurance coverage listed below. Proof of insurance mupt be <br /> Division of Minerals and Geology(DMG)or his designee. The submitted on certificates showing the following minimum <br /> Colorado Division of Minerals and Geology(DMG)is located at coverage: <br /> 1313 Sherman Street, Room 215, Denver, Colorado, 80203, <br /> telephone (303)866-3567. 1. Standard Worker's Compensation and Employer Liability, <br /> as required by State Statute including occupational <br /> PROJECT MANAGER-the Director of the Colorado Division of disease,covering all employees at the work site. <br /> Minerals and Geology or the DMG employee or representative <br /> responsible for day to day observation of project work at the 2. General Liability (Public Liability & Property Damage) <br /> job site, and general contract administration for the DMG. (Minimum): <br /> CONTRACTOR orSELLER-the sole proprietorship,partnership, a. Combined single limit of $600,000 written on an <br /> or corporation to which the Purchase Order is addressed. occurrence basis; <br /> b. Any aggregate will not be less than $1 million; <br /> PURCHASE ORDER CONTRACT DOCUMENTSI-An enforceable c. The contractor must purchase additional insurance if <br /> contract in that it is written evidence of the purchaser's claims reduce the annual aggregate below$600,000; <br /> acceptance of the seller's previous and unretracted offer to d. The State of Colorado must be named as additional <br /> perform the work subject of the purchase order for the price insured on each comprehensive general liability <br /> stated therein. The Purchase Order Contract includes the Bid, policy; <br /> Bid Schedule, General Conditions, Insurance Certificates, e. Certificates of insurance must be provided to the <br /> Purchase Order Terms and Conditions, Bid Solicitation State within 10 working days after receipt of Award; <br /> Memorandum,including Work Description,maps,Drawings and and, <br /> any Amendments. These documents are comdlementary;what f. Insurance shall include provisions providing <br /> is called for by any one document shall be as binding as if notification to the State 10 days prior to cancellation <br /> called for by all. of the coverage. <br /> In case of a difference between the contract documents, 3. Automobile Liability (Minimum). The contractor must <br /> precedence shall be given in the following respective order: carry a minimum of $600,000 combined single limit. <br /> Bid, Bid Solicitation Memorandum, General Conditions, <br /> Purchase Order Terms and Conditions, maps, and Drawings. The State of Colorado MUST be named as an Additions/ <br /> Amendments shall take precedence in the area of the bid Insured on the certificate of insurance. An Additional Insured <br /> document which they modify or clarify. In the case of any Endorsement amending such policy or policies must be <br /> such difference, the matter shall be promptly brought to the presented to the DMG prior to issuance of the Notice to <br /> attention of the PROJECT MANAGER who will make a Proceed. Bidders are advised to consult with their insurance <br /> determination in writing. carrier concerning these requirements. Submit a bid only if you <br /> are prepared to complete these requirements. <br /> WORK-The material and/or labor the seller is to furnish to the <br /> purchaser by operation under the purchase order. 5. WORK SCHEDULE <br /> SUBCONTRACTOR - A sole proprietorship,, partnership or After a Purchase Order has been issued, the will notify the <br /> corporation which has a contract with the CONTRACTOR for Contractor. Under no circumstances shall the CONTRACTOR <br /> the performance of labor at the site of the work regardless of begin work before a P.O. is issued. If the Bid Solicitation <br /> whether supplying of material is part of such contract, but Memorandum specifies project dates or a certain project <br /> without contractual relationship to the purchaser. schedule, the successful bidder shall perform the work during <br /> that specified time period. DMG reserves he right to cancel eh <br /> SUPPLIER - A sole proprietorship, partnership or corporation Purchase Order if the Contractor fails to begin the work as <br /> which over-the-counter or under contract furnishes the scheduled. <br /> CONTRACTOR material or equipment incorporated in the work <br /> or otherwise incident to the CONTRACTOR'S performance,but 6. ACCIDENT PREVENTION AND SAFETY MEASURES <br /> which performs no labor at the work site. <br /> The Contractor shall comply with applicable provisions of <br /> 2. CONDITIONS AFFECTING THE WORK OSHA Part 1926,Construction Standards and Interpretations, <br /> in effect on the date of Bid Opening. The Contractor shall <br /> In addition to examining the drawings and specifications, continuously maintain, at his expense,adequate protection of <br /> completion schedule,and other instructions,bidders shall visit the work and the Principle Representative's property, and shall <br /> the site and take such other steps as may be reasonably take all practicable precautions in the interest of safety. <br /> necessary to ascertain the nature and location of the work, <br /> including average climatic conditions and the general and local Any shafts which were fenced prior to construction activities <br /> conditions which can affect the work or the cost thereof. shall be protected by a temporary fence during non-working <br /> Failure to do so will not relieve bidders from responsibility for hours, without relieving the Contractor of its legal or <br /> estimating properly the difficulty or cost of successfully contractual duties to take safety precautions. Other openings <br /> performing the work. may be designated by the Project Manager as requiring fencing <br /> due to proximity of houses or visitation by tourists. <br /> 3. AWARD <br /> Work may involve activities around unprotected hazardous mine <br /> Award will be made with reasonable prompthiess, by written shafts,stopes,edits and other openings which may be open to <br /> notice to the low responsive and responsible bidder whose bid the surface or hidden from view by trash,debris,vegetation, or <br /> meets the requirements and criteria set forth in the Invitation thin and unstable layers of surficial materials or rock. The <br /> for bid. These criteria will include, but not be limited to the Contractor shall be responsible for thoroughly investigating the <br /> lowest GRAND TOTAL PRICE,corrected if necessary for errors site conditions and scheduling and directing his equipment, <br /> in price extension and/or addition, and capability to meet the equipment operations, personnel and safety procedures to <br /> performance time requirements. The GRAND TOTAL PRICE will prevent accidents and injuries. Failure to comply will be cause <br /> be used for comparing bids only. for immediate suspension of the work. <br />