My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-07-14_GENERAL DOCUMENTS - C1981017 (2)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
1997-07-14_GENERAL DOCUMENTS - C1981017 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2021 8:11:25 PM
Creation date
6/14/2012 10:56:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
7/14/1997
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mulches <br /> Mulching is required for this project. Mulch shall be provided by CONTRACTOR. For <br /> the slopes prepared during performance of Task 3, Outslope Preparation, mulch shall <br /> conform to Section 20.2 of the Revegetation Specifications, attached. All mulch shall <br /> be certified as noxious weed free or noxious weed seed free by any authorized State <br /> or County Officer. <br /> The CONTRACTOR will supply the fertilizer (commercial), mulch, and equipment for, <br /> fertilizer application, seeding and mulching. Revegetation efforts Aih occur on <br /> gpproximately six (6) acres of prepared slopes, including outslopes ,,n the north and <br /> east flanks of Mine 4, the loado4t pad area slope, and the east facia.-outslopes along <br /> the upper portions of the Road C corridor. <br /> Hand broadcast application of seed is preferred, however hydro seeding of the slopes <br /> is acceptable. If hydro seeding and hydro mulching of the slopes designated for <br /> preparation per Task 3, Outslope Preparation, is selected, the seed and fertilizer must <br /> be applied in a first application, and the mulch applied separately. <br /> Seed application rate will be at the rate spE o fied in Table 1, Outslcx,e Seed Mixture, <br /> for both hand broadcast and hydro seeding applications. <br /> SLOPES TO BE PROTECTED BY BONDED FIBER MATRIX PER TASK 5 <br /> Seed <br /> The seed listed in Table 1, Outslope Seed Mixture, will be provided by the OWNER. <br /> CONTRACTOR must give the PROJECT MANAGER at least ten (10)working days <br /> notice of the acreage to be seeded, so that the proper amount of seed is delivered. In <br /> addition, five pounds W) per acre of Calamagrostis (Sp?) and Sene:io (Sp?) seed, <br /> which was collected in Task 2, Native Seed Collection, shall be brocdcast on the <br /> outslopes. <br /> Fertilizers <br /> Fertilizer shall be provided by CONTRACTOR, and shall conform to Section 20.2 <br /> (commercial fertilizer) of the Revegetation Specifications, attached. Fertilizer shall be <br /> broadcast over the slope immediately prior to installation of the bonded fiber matrix <br /> (Task 5, Outslope Protection). <br /> Seedbed Preparation <br /> Seedbed preparation is unnecessary on the slopes designated for protection by the <br /> bonded fiber matrix application (Task 5, Outslope Protection). <br /> Mulches <br /> Mulch, in the form of the bonded fiber matrix, shall be provided and installed by <br /> 1T <br />
The URL can be used to link to this page
Your browser does not support the video tag.