Laserfiche WebLink
performed. The superintendent, in the CONTRACTOR'S 21. HISTORICAL PRESERVATION <br /> absence from the site, shall stand in the 'stead of the <br /> CONTRACTOR and any authoritative directions given to the Areas adjacent to the mine sites often contain related artifacts <br /> superintendent shall be as binding as if given to the and structures, such as buildings, tipples, ore houses, <br /> CONTRACTOR. headframes and foundations, that may be historically <br /> significant. Care shall be exercised to avoid any disturbances <br /> 16. WORK BY OTHERS to these structures and artifacts, in order to preserve their <br /> integrity. Existing structures shall not be used as load-bearing <br /> The work site is located in a mining area and mining or other devices. <br /> construction activities may be occurring at the,same time as <br /> the work proposed under this contract. It shall be the 22. UTILITIES <br /> CONTRACTOR'S responsibility to coordinate his work with <br /> those of the landowners, mining companies or other Utilities,both underground and above-ground,may exist which <br /> CONTRACTORS on the site. could affect construction work covered under this contract. <br /> The CONTRACTOR is responsible for determining the nature <br /> The CONTRACTOR shall, without charge, permit the and locations of any and all utilities which could affect <br /> landowner,mining companies,and such other CONTRACTORS construction work covered under this contract. The horizontal <br /> to use the roads and other facilities constructed or improved by and vertical locations of utilities may vary. The CONTRACTOR <br /> the CONTRACTOR for the contract work;provided, that such is responsible for excavation and equipment movement without <br /> usage shall in no way interfere with the contract work of the damage to utilities. The CONTRACTOR assumes all <br /> CONTRACTOR. responsibility for damages to any utilities he causes under this <br /> contract. <br /> 17. ACCESS AND WORKING AREA <br /> 23. ELECTRICAL POWER AND POTABLE AND <br /> Access to the sites or to the vicinity of sites is by public roads CONSTRUCTION WATER <br /> and private roads as shown on the drawings or as may be <br /> located in the field. Some sites may not have adequate access The CONTRACTOR shall be responsible for providing electrical <br /> roads for CONTRACTOR'S methods or equipment and power and potable and construction water as needed to <br /> construction or improvement of existing roads may be required. perform the contract work. If the CONTRACTOR desires to use <br /> Access roads used or constructed by the CONTRACTOR shall power other than portable generators, the CONTRACTOR'S <br /> be maintained and restored to pre-existing or better conditions. plans for providing such power will be subject to the OWNER'S <br /> prior approval. The cost for providing power and water will not <br /> The CONTRACTOR shall confine his access roads,equipment, be paid for separately but shall be included in the bid prices of <br /> the storage of materials and the operation of his workmen to the various work items. <br /> the immediate vicinity of the work sites and shall not <br /> unreasonably encumber the premises with his materials and 24. WORK PROGRESS <br /> equipment. Caution shall be exercised at all times to avoid <br /> blocking roads or in any other way interfering with operations The CONTRACTOR agrees that work will be performed with <br /> by others or presenting a hazard to personnel,equipment,or to due diligence in accordance with good engineering and <br /> the public. construction practices to the end that the entire contract work <br /> shall be completed within the time specified in the Bid <br /> The CONTRACTOR shall obtain all permits and/or permission Solicitation Memorandum. It is expressly understood and <br /> required to use public and private roads. The CONTRACTOR agreed,by and between the parties hereto, that the stipulated <br /> shall obey all laws and regulations affecting the,use of public project schedule described is a reasonable time for completion <br /> thoroughfares. of the work, taking into consideration all factors, including <br /> average climatic conditions prevailing in the area. <br /> The CONTRACTOR shall provide•such temporary barricades, <br /> fences, or warning signs as may be necessary to make For good and sufficient cause,such as(a)unsuitable weather, <br /> rintendence, (d) the <br /> temporary or permanent roads safe by night as well as by day. (b)faulty workmanship, (c)improper supe <br /> He shall at all times have a sufficient number of watchmen, CONTRACTOR'S failure to carry out any reasonable order or to <br /> flagmen, and warning lights to protect traffic where it is perform any provision of the purchase order and collateral <br /> interfered with by his operations, where his trucks enter or documents, or (e) any other circumstance unfavorable for <br /> leave public roads, or where work is being done adjacent to prosecution of the work, the OWNER shall have the right to <br /> such roads. suspend the CONTRACTOR'S performance of the work. Notice <br /> of such suspension shall be in writing. The CONTRACTOR <br /> 18. PERMITS, LICENSES AND REGULATIONS shall resume performance of the work promptly when so <br /> notified in writing. The CONTRACTOR shall not be entitled to <br /> Permits and licenses required for prosecution of the work shall any cost or damages resulting from such suspension. There <br /> be procured and paid for by the CONTRACTOR. will be added to the time estimated for the project work noted <br /> in the Special Conditions the number of days, if any, that the <br /> 19. ROYALTIES AND PATENTS CONTRACTOR is allowed for reasons of unusual, unsuitable <br /> weather as stipulated above. No extension of time shall be <br /> The CONTRACTOR shall pay all royalties and license fees. He allowed for reasons as stipulated in(b), (c), and (d)above. <br /> shall defend all suits or claims for infringement of any patent <br /> rights and shall save the State of Colorado harmless from loss If the CONTRACTOR is responsible for a delay in progress of <br /> on account thereof. the work, the CONTRACTOR shall, without additional cost, <br /> work overtime and utilize such additional equipment and <br /> 20. PROJECT PUBLICITY manpower as may be necessary to complete the contract work <br /> by the stipulated date. Failure to comply will be grounds for <br /> The OWNER will be sole provider of information about the termination of this Agreement as stipulated below or <br /> project work to area residents, and special districts, county, assessment of liquidated damages as stipulated under the <br /> state, and federal agencies, and individuals from the media. Liquidated Damages clause of these General Conditions. <br /> Any contact with these groups by the CONTRACTOR must be <br /> cleared through the OWNER. If the CONTRACTOR should fail to prosecute the work properly <br /> and diligently, or default performance of any provision of the <br /> Colorado Division of Minerals&Geology GENERAL CONDITIONS FOR PURCHASE ORDERS <br /> August 21, 1996 Page 3 <br />