My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (206)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (206)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 9:29:16 AM
Creation date
6/14/2012 10:55:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.0 MOBILIZATION/DEMOBILIZATION <br /> 1.1 DESCRIPTION <br /> This specification covers the CONTRACTOR'S operations for: <br /> a. Payment of premiums for bonds and insurance acquired specifically for <br /> the construction of this project, including premiums for performance and <br /> payment bonds; <br /> b. Movement of personnel, equipment, operation supplie,; and incidentals <br /> to the project site;! <br /> C. Establishment of office, buildings, and other necessary temporary <br /> facilities at the project site; <br /> d. Preparatory work at the construction site; and, <br /> e. All temporary barricades or fencing used to safeguard mine openings <br /> during construction. Any shafts which were fenced prier to construction, <br /> or other openings designated by the Principle Representative, shall be <br /> protected by a temporary fence during non-working hours. <br /> f. Demobilization of CONTRACTOR'S equipment and all other facilities, <br /> final project clean-up, and for all other work for which payment is not <br /> otherwise provided for under the contract. <br /> The temporary facilities may include, but not be limited to the following: <br /> a. Workshops, offices, storage yards, and construction p;,;nt and <br /> equipment including spare parts, fuels, and oil; <br /> b. Sanitation facilities, communication facilities, and sprinkler trucks; <br /> C. Contractor's electrical power system; and, <br /> d. Other items such as water, compressed air, etc., not specifically listed <br /> but required for the functioning of construction activities. <br /> 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.