My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (206)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (206)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 9:29:16 AM
Creation date
6/14/2012 10:55:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 37. DIFFERING SITE CONDITIONS <br /> (a) The Contractor shall promptly, and before such conditions are disturbed, notify the <br /> Principle Representative of: <br /> (1) subsurface or latent physical conditions at the site differing materially from <br /> those indicated in the Contract, or <br /> (2) unknown physical conditions at the site, of an unusual nature, differing <br /> materially from those ordinarily encountered and generally recognized as <br /> inherent in work of the character provided for in this Contract. <br /> The Principle Representative shall promptly investigate the conditions, and if he finds <br /> that such conditions do materially so differ and cause an increase or decrease in the <br /> Contractor's cost of, or the time required for, performance of any part of the work <br /> under this Contract, whether or not changed as a result or such conditions, an equitable <br /> adjustment shall bei made and the Contract modified in writing accordingly. <br /> (b) No claim of the Contractor under this clause shall be allowed unless the Contractor has <br /> given the notice required in (a) above; provided, however, the time prescribed therefor <br /> may be extended by the State. <br /> (c) No claim by the Contractor for an equitable adjustment hereunder shall be allowed if <br /> asserted after final payment under this Contract. <br /> Article 38 CHANGES IN THE WORK <br /> The Principle Representative, without invalidating the Contract, may order extra work, or make any <br /> other reasonably related changes by altering adding to or deducting from the work; the contract price <br /> and time for completion of the work will be adjusted accordingly by written change order. <br /> All such work shall be executed under the conditions of the original contract except that any claim for <br /> extension of time caused by changes authorized in the change order shall be included in the written <br /> change order. <br /> The Principle Representative shall have authority to make minor changes in the work, not involving <br /> extra cost, and not inconsistent with the purpose of the work, but otherwise, except in an emergency <br /> endangering life or property, no extra work or change in the Contract Documents shall be made unless <br /> by a written change order, approved by the Principal Representative. No claim for any change to the <br /> Contract sum shall be valid unless 'so ordered. <br /> The value of any extra work or change shall be determined in one or more the following ways: <br /> (a) By estimate and acceptance in a lump sum; <br /> (b) By unit prices named in the Contract or subsequently agreed upon; <br /> (c) By actual cost plus a fixed fee, or percentage, the latter agreed upon prior to starting <br /> the extra or changed work. <br /> Changed work shall be adjusted and considered separately for the work either added or omitted. The <br /> amount of adjustment for work omitted shall be estimated at the time it is authorized, and the agreed <br /> adjustment will be deducted from the subsequent monthly progress payments. <br /> Article 39 CLAIMS FOR EXTRA COST <br /> If the Contractor claims that any instructions, by drawings or otherwise, involve extra cost under this <br /> Contract, he shall give the Principle Representative written Notice thereof within a reasonable time <br /> after the receipt of such instructions. In any event, before proceeding to execute the work, except <br /> in emergency endangering life or property, the procedure shall be as provided for under Article 38, <br /> CHANGES IN THE WORK. No such claim shall be valid unless so made. <br /> Colorado Division of Minerals & Geology GENERAL BID SPECIFICATIONS <br /> 1996 Page 13 <br />