Laserfiche WebLink
r ` <br /> Construction Summary <br /> Collected native seed, created beeches on portions of slopes; seed, fertilizer, straw mulch <br /> and tack on lower slopes; seed fertilizer and apply soil guard to east and top of the north <br /> slopes. <br /> V. FUTURE MAINTENANCE <br /> Possible rill and gully, repair and/or interseed if revegetation fails. <br /> VI. SUMMARY <br /> Project Manager: Steve Renner <br /> Date: November 12, 1997 <br /> m•\imp\y]b\bidforms\cocdb sn4.clo <br />