My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-11-10_GENERAL DOCUMENTS - C1981017
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
1997-11-10_GENERAL DOCUMENTS - C1981017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2021 10:07:56 AM
Creation date
6/14/2012 10:54:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
11/10/1997
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 6. APPLICANT VIOLATOR SYSTEM <br /> The successful bidder will be requirec to submit a completed AML Contractor Ownership and Control <br /> Form and pass a check of the Applicant Violator System. <br /> Although there are many circumstances under which a bidder might be found "not responsible", any <br /> contractor who has had direct or indirect association with a firm that has had a permit revoked or a <br /> bond forfeited by the Division of Min rats and Geology or the Mined Land Reclamation Board will be <br /> considered not responsible, and not eligible to be awarded any bid. Any firm listed in the federal Office <br /> of Surface Mining's Applicant Violator)System or who is not confirmed by the Office of Surface Mining <br /> will be considered not responsible. <br /> Article 7. MINORITY/WOMEN 130SINESS PARTICIPATION <br /> The successful bidder is required to complete and return the Minority (MBE)/women (WEE) Business <br /> Participation form before an Agreement will be executed. <br /> Article 8. NOTICE TO PROCEED <br /> After the Agreement has been fully- xecuted, the Principle Representative will issue the Notice to <br /> Proceed consistent with the project dates in the Special Conditions. Under no circumstance shall the <br /> Contractor begin work before a Notice to Proceed is issued. <br /> Article S. ACCIDENT PREVENTION AND SAFETY MEASURES <br /> The Contractor shall comply with applicable provisions of OSHA Part 1926, Construction Standards <br /> and Interpretations, in effect on the d to of Bid Opening. The Contractor shall continuously maintain, <br /> at his expense, adequate protection of the work and the Principle Representative's property, and shall <br /> take all practicable precautions in they interest of safety. <br /> Any shafts which were fenced prior to construction activities shall be protected by a temporary fence <br /> during non-working hours. Without relieving the Contractor of its legal or contractual duties to take <br /> safety precautions, other openings may be designated by the Principle Representative as requiring <br /> fencing due to proximity of houses or visitation by tourists. <br /> Work may involve activities around unprotected hazardous mine shafts, stopes, adits and other <br /> openings which may be open to the surface or hidden from view by trash, debris, vegetation, or thin <br /> and unstable layers of surficial materials or rock. The Contractor shall be responsible for thoroughly <br /> investigating the site conditions and i;cheduling and directing his equipment, equipment operations, <br /> personnel and safety procedures to prlevent accidents and injuries. Failure to comply will be cause for <br /> immediate suspension of the work. <br /> All Chemicals, equipment and materials proposed and/or used in the performance of this Contract must <br /> conform to the standards required by the William-Stieger Occupational Safety and Health Act of 1970. <br /> Bidders must furnish all Material Safety Data Sheets (MSDS) for any regulated chemicals, equipment <br /> or hazardous materials at the time of idelivery to the job site. <br /> Article 10. PLANS AND WORKING DRAWINGS <br /> The drawings if any, included with the Contract Documents are complete and adequate for <br /> construction. While every effort has'been made to have the plans and drawings free of errors and <br /> ambiguities, any such errors or ambiguities must be brought to the Principle Representative's attention <br /> immediately. <br /> Colorado Division of Minerals & Geology GENERAL BID SPECIFICATIONS <br /> 1996 Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.