Laserfiche WebLink
essrs. Jim Herron, Brian Munson r: <br /> ,July _12, 1983 <br /> ,age 4 <br /> M <br /> �i <br /> VIII. ENGINEERING <br /> The on-the-ground detailed survey work, including cross-sections, etc. <br /> is presently being done. The engineering, that is, design of the cut <br /> and fill, is also presently being done and will be submitted shortly. <br /> IX. SUMMARY T <br /> In the interest of saving time we would hopefully request that the <br /> Division review these portions of the T. R. and the detailed soils {a. <br /> and engineering sections will follow very shortly. � <br /> Our goal is to obtain the permit and complete the dirt work before <br /> winter, in order to obtain the additional stabilization of all con- <br /> structed areas during the winter, and also to be able to revegetate a <br /> everything this fall. Construction of the actual conveyor belt sys- <br /> tems then could begin in early spring. : <br /> Please contact me if you have any questions regarding this revision . <br /> Sincerely, ' <br /> A' <br /> Environmental Coordinator , <br /> W <br /> DWBowman:ms <br /> w <br /> Enclosures <br /> Copies to <br /> J. A. Reeves <br /> J. H. Turner <br /> r <br /> t � <br /> a <br /> ^t <br /> L1 A. <br />