My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-06-18_GENERAL DOCUMENTS - C1981017
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
1997-06-18_GENERAL DOCUMENTS - C1981017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2021 11:55:39 AM
Creation date
6/14/2012 9:59:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
General Documents
Doc Date
6/18/1997
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 19.3 EXECUTION <br /> Operators <br /> The equipment shall be furnished complete with competent operating personnel. Operators shall be <br /> qualified to perform all work under this specification in a skillful and professional manner. The OWNER <br /> may, in writing, require the CONTRACTOR to remove from the work any employee the OWNER deems <br /> incompetent or careless. The OWNER will be the sole judge of the acceptability of any employee. <br /> Supervision <br /> The CONTRACTOR shall be responsible for the supervision of all mechanical operations of the <br /> equipment including proper maintenance. <br /> Equipment maintenance, fueling and repairs shall be done sot that spilling of lubricants and fuel is <br /> minimized. <br /> Performance of Work <br /> Supplemental work shall be performed after the general construction work in that particular area and <br /> shall consist of general earthmoving or other finishing work as may be directed by the PROJECT <br /> MANAGER. <br /> All operations under this section will be under the direct supervision of the PROJECT MANAGER and <br /> work under this section shall be performed only as ordered and directed by the PROJECT MANAGER. <br /> The PROJECT MANAGER will designate the work to be performed and the order in which it is to be done, <br /> and WILL inspect all work. The PROJECT MANAGER will maintain documentation of the work. <br /> Equipment Rental Documentation <br /> At the close of each day's operations during which equipment rental work has been conducted under <br /> this specification, the PROJECT MANAGER shall prepare a form entitled "Equipment Rental Record" <br /> listing the date, times and total hours (computed to the nearest one-half hour), each piece of equipment <br /> was operated in accordance with this specification. The PROJECT MANAGER will obtain the signature <br /> of the CONTRACTOR on the form. <br /> "Operation" means that time spent in performing work as well as time necessary for moving equipment <br /> around the work site when directed by the PROJECT MANAGER. However, "operation" does not include <br /> that time spent in transporting the equipment to the initial work site, removing the equipment when all <br /> work had been completed, transporting the equipment away from and returning it to the work site in the <br /> event of a temporary or seasonal suspension of operation, maintenance of the equipment, any time <br /> during which the equipment is "bogged down" or otherwise not working, nor for any periods when <br /> operations are suspended by the PRINCIPLE REPRESENTATIVE. <br /> 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.