Laserfiche WebLink
1.0 MOBILIZATION/DEMOBILIZATION <br /> 1.1 DESCRIPTION <br /> This specification covers the CONTRACTOR'S operations for: <br /> a. Payment of premiums for bonds and insurance acquired specifically for the construction <br /> of this project, including premiums for performance and payment bonds; <br /> b. Movement of personnel, equipment, operation supplies, and incidentals to the project <br /> site; <br /> C. Establishment of office, buildings, and other necessary temporary facilities at the project <br /> site; <br /> d. Preparatory work at the construction site; and, <br /> e. All temporary barricades or fencing used to safeguard mine openings during <br /> construction. Any shafts which were fenced prior to construction, or other openings <br /> designated by the Principle Representative, shall be protected by a temporary fence <br /> during non-working hours. <br /> f. Demobilization of CONTRACTOR'S equipment and all other facilities, final project <br /> clean-up, and for all other work for which payment is not otherwise provided for under the <br /> contract. <br /> The temporary facilities may include, but not be limited to the following: <br /> a. Workshops, offices, storage yards, and construction plant and equipment including spare <br /> parts, fuels, and oil; <br /> b. Sanitation facilities, communication facilities, and sprinkler trucks; <br /> C. Contractor's electrical power system; and, <br /> d. Other items such as water, compressed air, etc., not specifically listed but required for <br /> the functioning of construction activities. <br /> 1.2 EXECUTION <br /> Mobilization <br /> Upon receipt of the Notice to Proceed, the CONTRACTOR shall furnish, mobilize, move in, and install <br /> such temporary works and equipment as are necessary for the successful completion of the work. The <br /> CONTRACTOR shall also operate and maintain such temporary works, equipment and construction <br /> plant throughout the period of construction. All applicable temporary works, such as sanitation <br /> facilities, shall fully comply with all rules and regulations. <br /> 22 <br />