My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-06-18_GENERAL DOCUMENTS - C1981017
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
1997-06-18_GENERAL DOCUMENTS - C1981017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2021 11:55:39 AM
Creation date
6/14/2012 9:59:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
General Documents
Doc Date
6/18/1997
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPECIAL CONDITIONS <br /> Coal Basin/Warehouse Area Reclamation Project <br /> Permit Number C-81-017 <br /> PKA-7-397 <br /> PROJECT LOCATION <br /> The project is located four miles west of Redstone in Pitkin County, Colorado. The mine is accessed via <br /> a paved service road. Roads on the mine property are improved dirt (Map 1, General Location Map). <br /> WORK SUMMARY <br /> The project will be conducted on a mine site previously permitted by the State of Colorado, Division of <br /> Minerals and Geology (Map 3, Coal Basin Mine Map). The site was active as an underground mining <br /> operation from 1953 until 1991. The Colorado Mined Land Reclamation Board revoked the mining permit <br /> and forfeited the reclamation bond. The disturbances created as a result of activities at the site since <br /> August 3, 1977 are the subject of the reclamation activities addressed in this and subsequent Invitation <br /> to Bid documents. <br /> The project work will include demolition and disposal of concrete and cinder block building and <br /> foundation remnants, grading of a conveyor belt corridor, reduction and grading of coal stockpile <br /> benches and back walls, contour furrow and channel construction and revegetation activities. <br /> PRE-BID MEETING AND SITE SHOWING <br /> A mandatory pre-bid meeting and site showing will begin at the Coke Ovens at the south turnoff to <br /> Redstone on State Highway 133 (Map 2, Pre-Bid Meeting Location). This mandatory meeting will begin <br /> on June 16, 1997 at 10:30 a.m. <br /> The Pre-Bid Meeting is for the purpose of showing prospective bidders the work site and vicinity. <br /> Bidders are advised to be prompt. A sign-in sheet will be available at the Pre-Bid meeting for firms to <br /> register their attendance. It is the bidder's responsibility to make certain their attendance is recorded <br /> on the sign-in sheet. Failure to sign-in or to attend the entire meeting will be cause for rejection of a bid. <br /> Bidders are cautioned that, notwithstanding any remarks or clarifications given at this meeting and site <br /> showing, all terms and conditions of the contract documents remain unchanged unless they are <br /> changed by written amendment issued by the OWNER. If the answers to questions, or any amendment <br /> to the contract documents create ambiguities, it is the responsibility of the bidder to seek clarification <br /> prior to submitting a bid. <br /> BID OPENING DATE <br /> The bid opening date for this project is June 30, 1997 at 2:30 p.m. All bid openings are open to the public <br /> and bidders are welcome to attend and record the bid results. A written tabulation of the Bid results will <br /> be available to those bidders who submit a clearly-visible, self-addressed, stamped envelope with their <br /> bid. Please allow two weeks for receipt of Bid results. Telephone requests cannot be honored because <br /> of time constraints. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.