Laserfiche WebLink
Task description: Cost <br />Site: Bowie No. 2 Mine <br />PROJECT IDENTIFICATION <br />Page 1 of 7 <br />COST SUMMARY WORK <br />Permit Action: Technical Revision 72 Permit/Job #: C1996083 <br />Task #: OOA State: Colorado <br />Date: 6/14/2012 County: Delta <br />User: SLB <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: C083 -00a <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />124 <br />150 <br />45a <br />Replace Topsoil from Stockpile to Gob Pile #2 <br />SCRAPERI <br />1 <br />1 <br />1 <br />2.28 <br />$1,248.50 <br />$4,144.79 <br />$8,950.06 <br />Drill Seed Mix 3 on Disturbed Area <br />REVEGE <br />4.00 <br />Replace Subsoil from Stockpile to Gob Pile #2 <br />SCRAPERI <br />16.34 <br />TOTAL O & P = <br />$2,545.37 <br />SUBTOTALS: <br />22.62 <br />$ $14,343.35 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />2.02 <br />Total = <br />$289.74 <br />Performance bond: <br />1.05 <br />Total = <br />$150.61 <br />Job superintendent: <br />11.31 <br />Total = <br />$670.68 <br />Profit: <br />10.00 <br />Total = <br />$1,434.34 <br />TOTAL O & P = <br />$2,545.37 <br />CONTRACT AMOUNT (direct + O & P) = <br />$16,888.72 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT <br />Financial warranty processing (legal /related costs): <br />0.00 <br />Total = 0.00 <br />Engineering work and /or contract/bid preparation: <br />4.25 <br />Total = $717.77 <br />Reclamation management and /or administration: <br />3.13 <br />$528.62 <br />CONTINGENCY: <br />0.00 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $3,791.76 <br />TOTAL BOND AMOUNT (direct + indirect) = $18,135.11 <br />CIRCES Cost Estimating Software <br />