My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1992-02-10_GENERAL DOCUMENTS - C1981017 (2)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
1992-02-10_GENERAL DOCUMENTS - C1981017 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2021 9:22:06 AM
Creation date
6/14/2012 9:08:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
2/10/1992
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r •A•+I' I <br /> y RES LTS OF SUBS i DENCE SURVEYS RECEIVED <br /> COAL BASIN MINES <br /> ITK N COUNTY, WMADO SCN 1,41983 <br /> MINED LAND RECLAMATION DIVISION <br /> Colo. Dept. of Natural Resources . <br /> 1 .0 INTRODUCTION � . <br /> s. This report resents the results of three surveys of the subsidence <br /> P P Y <br /> monitoring points In the I Basin area, Pitkin County, Colorado.:, The three <br /> monitoring surveys were pe formed In August 1981 , July 1982 and August 1983. <br /> ;. <br /> They were performed at the request of Mr. Douglas W. Bowman, Environmental <br /> Coordinator for MId-Conti nt Resources, , Inc., Carbondale, Colorado. <br /> 2.0 SCOPE OF WORK <br /> The scope of work for this project was outlined in a letter to Mr. Bowman - <br /> 4{ <br /> from Mining b Subsidence E gineering Company dated April 5, 1983. The scope of <br /> work was as follows: <br /> 1 . Survey the existing monitoring points during August 1983 2. Prepare a rep rt with the following information - - <br /> a. Method of survey ;. .a <br /> b. EquipEntrol <br /> nt used <br /> � . c. Coordates and elevations of existing <br /> points (TP-series) ' <br /> d. Coordinates and elevations of the nine .„ <br /> on i for i ng points for each of the 4.4fi <br /> field surveys in 1981, 1982 and 1983 ' <br /> e. Surtma les of the survey field data <br /> The field survey data which provide the basis for the engineering <br /> calculations in this repo t are presented In the Appendix to this report. <br /> 3.0 SURVEYING EQUIPMENT AND METHODOLOGY <br /> . 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.